Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Meta Selects DPR for $1B Arizona Data Center
Industry News

Meta Selects DPR for $1B Arizona Data Center

Machinery AsiaBy Machinery AsiaDecember 6, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: data center
Value: 1 billion dollars
Location: Mesa, Arizona
Customer: Goal

Meta, the parent company of Facebook, has selected Redwood City, California-based contractor DPR Construction to build its $1 billion data center in Mesa, Arizona, the contractor told Construction Dive.

The project, first announced in August 2021, is a five-building campus development spanning more than 2.5 million square feet of data center and administration space. The campus, which DPR hopes to complete by 2026, will use 12,000 tons of steelthey incorporate more than 600 miles of framing studs and use 700 acres of drywall, according to a social media post from Mesa Mayor John Giles.

Once complete, the Mesa data center will be one of the most advanced and energy- and water-efficient data centers in the world, according to Meta. The site will be supported by 100% renewable energy and is slated for LEED Gold certification by the US Green Building Council.

DPR previously delivered the first Meta development at the Prineville data center in Oregon, followed by the Forest City data center in North Carolina and the Luleå data center in Sweden. Some of its current projects include other Meta data centers in Texas, Virginia and Tennessee.

Booming Phoenix Market

The Phoenix region has suffered a project boom recentlyspecifically in the data center manufacturing and construction space.

Some of the region’s biggest projects, in addition to Meta’s $1 billion data center in nearby Mesa, include a Google’s $600 million data center and two $20 billion worth of semiconductor factories in chandler These massive projects, which are beginning to press steel supply for smaller contractorsthey continue to target cities like Phoenix because of their low risk of natural disasters.

Nationally, data center construction demand remains strong, although some signs of slowing down have emerged Still, data center construction activity in primary US markets rose 25% year-over-year to a record 2,288 megawatts of capacity in the first half of 2023, according to CBRE, a commercial real estate services firm based in Dallas.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleProject scheduling is still plagued by software honesty issues
Next Article JCB introduces a hydrogen-powered backhoe in India
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.