Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Purchase of £170m green energy terminal begins
Industry News

Purchase of £170m green energy terminal begins

Machinery AsiaBy Machinery AsiaNovember 1, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Associated British Ports (ABP) is seeking expressions of interest from potential contractors for a project worth up to £170 million to build a green energy terminal in Lincolnshire.

In a pre-information notice, ABP said it intends to appoint a main contractor or consortium to build the facility at the port of Immingham on the south shore of the Humber Estuary.

The Immingham Green Energy Terminal will support the import of liquid bulk products, including green ammonia from Saudi Arabia, which will be converted to green hydrogen to support the transition to net zero by 2050 .

The terminal will also support the import of carbon dioxide for carbon capture and storage. ABP plans to provide capacity for multiple customers.

The 100-hectare development would include a 1.1km jetty leading to a single approach berth with loading platforms and infrastructure for handling bulk liquids.

The land infrastructure of the project would include an access road, two hydrogen production sites and other works and buildings.

the project it still requires the consent of the Urban Planning Inspectorate. In October, the inspectorate decided to accept the project for consideration for a development consent order. He now has about three months to prepare for the exam stage.

Together, the next stages could take another year before the Secretary of State has to make a final decision.

Between May and July of this year, a second legal consultation of the project was carried out. After the first consultation in January and February, several adjustments were made, including site boundary amendments and design changes.

ABP has applied an estimated range of values ​​”due to the conservative nature of the current design”. The project currently costs between £140m and £170m.

The Port of Immingham is the largest and busiest of ABP’s four Humber ports. Along with Hull, Grimsby and Goole, it forms part of the UK’s largest port complex.

The deadline for expressions of interest is November 30.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBoston expands construction safety requirements
Next Article Toyota’s $8 million boost brings investment in North Carolina battery plant to nearly $14 million
Machinery Asia
  • Website

Related Posts

GDC Greenlights $88M Trade Order Ahead of 2028 Hudson Tunnel Boring

July 15, 2026

Contractor wins $11.3 million judgment in Milwaukee wood tower lawsuit

July 15, 2026

Kennedy Center repairs were rushed, shoddy, whistleblowers allege

July 15, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

GDC Greenlights $88M Trade Order Ahead of 2028 Hudson Tunnel Boring

Contractor wins $11.3 million judgment in Milwaukee wood tower lawsuit

Kennedy Center repairs were rushed, shoddy, whistleblowers allege

Builders await implementation plans as the landmark housing bill becomes law

Popular Posts

GDC Greenlights $88M Trade Order Ahead of 2028 Hudson Tunnel Boring

July 15, 2026

Contractor wins $11.3 million judgment in Milwaukee wood tower lawsuit

July 15, 2026

Kennedy Center repairs were rushed, shoddy, whistleblowers allege

July 15, 2026

Builders await implementation plans as the landmark housing bill becomes law

July 14, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.