Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Skanska Nabs 444 million dollars of New Jersey Bridge contract
Industry News

Skanska Nabs 444 million dollars of New Jersey Bridge contract

Machinery AsiaBy Machinery AsiaApril 2, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Prize: Award Replacement of the bridge
Value: 444 million dollars
Location: County of Middlesex, New Jersey
Customer: New Jersey Transit Corporation

Skanska has won a contract of $ 444 million to replace the Raritan River Bridge in Middlesex CountyNew Jersey, the contractor and developer of Sweden, announced on Tuesday.

The bridge serves as a direct link between the cities of New Jersey by Perth Amboy and South Amboy on the Raritan River. The existing bridge suffered damage by Superstorm Sandy in 2012, according to the statement.

The Raritan Bridge “serves as a critical passage for more than 10,000 daily passengers and 2 million tonnes of goods a year,” said Bill Matre, Senior Vice President and CEO of Skanska Koch, the regional office of the New Jersey firm, in the statement.

Skanska Koch too did work on Brooklyn BridgeWinning a contract of $ 508 million to rehabilitate the period between 2010 and 2014. The work included eliminating lead -based paint, painting the structure and replacing approximately 600 bridge pads.

The project’s work on the Raritan bridge will begin this month and will conclude by 2029.

The scope of the job construction work includes demolishing the existing swinging bridge and the construction of new vertical lifting bridge towers, an extension extension, two flank systems and communication systems. Additional work will involve the work of Catenary General, Earth’s work and the railway system.

In addition, to ensure future sustainability, resilience and security, Skanska said, the new bridge will provide additional vertical authorization over the 100 -year flood elevation and will position itself farther from the Atlantic Ocean to minimize the risk of damage to extreme weather events.

Skanska also said that “improved browsing channels” will minimize the risks of collision of ships and repair costs associated with the Pont Moll Protection systems.

It Francis Scott Key Bridge in Baltimore collapsed Just over a year ago as a result of a boat that clashed with one of its pillars. He had no mitigation, like the dolphins, to lead the impact far from the structure, and the National Transport Safety Board stated that he – and other bridges across the country – could not make evaluations to evaluate the risk.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleOfficials of the LIGHT Railway Project for CMAR Design Construction
Next Article FROM THE BANGKOK TORRE OF 33 FLATS IN EARTHERITAGE FILLED OF THE LOWER CONSTRUCTION
Machinery Asia
  • Website

Related Posts

Jacobs-McCarthy JV begins work on $185 million California water project

June 23, 2026

Superior Construction CEO: “All good mentors were at one point”

June 23, 2026

Toronto hospital tower moves ahead with $1-2 million in acquisitions

June 23, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Jacobs-McCarthy JV begins work on $185 million California water project

Superior Construction CEO: “All good mentors were at one point”

Toronto hospital tower moves ahead with $1-2 million in acquisitions

Project data should speed up decisions, not slow them down

Popular Posts

Jacobs-McCarthy JV begins work on $185 million California water project

June 23, 2026

Superior Construction CEO: “All good mentors were at one point”

June 23, 2026

Toronto hospital tower moves ahead with $1-2 million in acquisitions

June 23, 2026

Project data should speed up decisions, not slow them down

June 23, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.