Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Sun Streams 4 Solar Project Tracks Mid-2025 Completion
Industry News

Sun Streams 4 Solar Project Tracks Mid-2025 Completion

Machinery AsiaBy Machinery AsiaMarch 20, 2024No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Sun Streams 4 project, a 377 MWdc, 300 MWac/1200 MWh solar PV and 300 MWac battery storage facility 40 miles west of Phoenix, has been completed approximately a third and has a maximum workforce of approximately 250 solar construction workers, including More than 65 registered apprentices.

With a goal of completion in mid-2025, the project is being led by McCarthy Building Cos.’ renewable energy team, acting as an EPC contractor. Developed by Boston-based Longroad Energy as owner and operator, this is the renewable energy company’s largest solar and battery storage project in the US.

“The solar workforce is playing an important role in Arizona’s transition to sustainable renewable energy,” says Dan Brown, a member of McCarthy’s renewable energy team. “This is our fifth project with Longroad, and we are proud to continue cultivating and developing Arizona’s skilled solar workforce.”

Sun Streams 4 is Longroad’s largest solar project to date and includes funds from the Inflation Reduction Act.

The project site will include wildlife corridors to protect native species habitat and allow wildlife to pass through during operations.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleOSHA cites Texas contractor after trench collapse kills 18-year-old employee
Next Article Headline, Q&D Replaces Reno-Tahoe Airport concourses
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.