Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Sundt begins work on the Ocotillo road project in Gilbert, Arizona.
Industry News

Sundt begins work on the Ocotillo road project in Gilbert, Arizona.

Machinery AsiaBy Machinery AsiaAugust 28, 2024No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Sundt has begun the Kimley Horn-designed Ocotillo Bridge and Highway Extension Project for Gilbert, Arizona. The project will extend Ocotillo Road from Greenfield Road to Higley Road, a 0.85-mile stretch that will cross four waterways by constructing three bridges and a box culvert.

The largest structure, the Ocotillo Bridge, will cross the Chandler Heights Regional Basin, where future phases of Gilbert Regional Park are being designed. More than 6,000 residents submitted comments on the bridge design, which will include two pedestrian bridges with two entrances to the future 272-acre park.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSkid Steer Auger Putting In Work
Next Article Spawn of Typhon – Born Into Hatred [2017 EP]
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.