Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป The 5 main causes of construction delays
Industry News

The 5 main causes of construction delays

Machinery AsiaBy Machinery AsiaSeptember 26, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive Brief:

  • Waiting for other disciplines to finish their work before starting the next phase of work is the main cause of construction delaysaccording to a new report from Touchplan, a Boston-based production planning platform.
  • Staffing shortages, followed by material and equipment delays, rank as the second and third largest contributors, reflecting ongoing labor and supply chain challenges in the industry.
  • According to the report, design changes and time-related breaks round out the main reasons for delayed activities.

Diving knowledge:

Touchplan users provided reasons for delays whenever tasks finished late on the platform. The platform captured data from over 321,000 scheduled construction jobs over the past 12 months.

The main cause of delays comes from poorly executed transfers between operations. These problems result in extended deadlines and increased costs, seriously affecting the master schedule in commercial construction projectsaccording to the report.

These inefficient transfers lead to worker congestion and rework, which further hampers overall productivity, said Jason Lyon, vice president of customer success at Touchplan.

“Missed deliveries equal rescheduling, and rescheduling creates more time spent in planning meetings,” Lyon said in the statement. “You have to overcome the challenges that are created as a result of missed deliveries.”

Lyon identified insufficient staffing as another major headwind for the project’s progress.

“The construction industry is struggling with a persistent shortage of skilled labor that is driving up costs and delaying projects,” says Lyon. “With increased work demands and no immediate workforce solutions, contractors must proactively ensure tasks are completed efficiently and disruptions are minimized through proactive planning practices and collaborative”.

Acquisition of material has long been identified as a major contributor to delays, often due to supply chain disruptions and long lead times for critical components. For this reason, according to the report, flexible material availability planning is now an integral part of successful project management.

Design changes, although less frequent, cause significant delays when they occur. Miscommunications or last-minute change orders often lead to rework, disrupting deadlines and creating confusion at the site, Lyon said.

Finally, weather-related delays, while harder to predict, are still a threat to project schedules. Severe conditions, such as heavy rain or extreme heat, can affect labor productivity, material delivery, and ultimately overall project timelines.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMini Skid Steer Stand On Track Loader 1 Ton Weight With 23HP Briggs & Stratton Engine
Next Article #auction July 8th! 2023 AGROTK QH12 Hydraulic Excavator #barnoneauction #miniexcavator
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.