Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » The new water infrastructure company is launched in Arizona
Industry News

The new water infrastructure company is launched in Arizona

Machinery AsiaBy Machinery AsiaMay 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Brief of diving:

  • Two former co -workers have launched RS Contracting, a general scottsdale contracting firm, based in Arizona, specializing in the construction and rehabilitation of wastewater and wastewater infrastructure throughout the state, according to a statement on May 16 shared with construction.
  • The firm’s services include design, construction and updates for wastewater treatment facilities and wastewater; Installation and rehabilitation of pipes; Bomb station, elevation station and installation of the site; as well as water recovery, classification, drainage and useful work.
  • Tim Rockholt and Dennis Sime met in 2001 as they worked for the Felix Construction Water and Water Waters. Prior to founding the recruitment of RS, Rockholt and Sime they were members and operated on Bureau, Asr Construction, based on Arizona, for five years before creating Rs.

Divide vision:

The aging of the country Water -expanding water infrastructure in environmental expansion and the new cleaning requirements, according to the infrastructure information card of the American Society of Civil Engineers Engineers. The drinking water infrastructure pointed out a “C-” while the wastewater obtained a “D+” and rainwater linked to traffic for the category with the lowest degree of “D”, all unchanged from the previous report card of Asce in 2021.

In particular, Arizona has long faced water shortages and its fast -growing data center industry, fed by the AI ​​boom, is putting huge demands on its water systems. That said, the industry is trying to address concerns about water consumptionAnd now most of the facilities built in Arizona use a refrigerated air design that consumes approximately the same amount of water as other industrial buildings of similar size, Az Big Media reported.

However, there is a large number of works for the firm in the state of the scant. RS Contracting has general commercial designations and general engineering and works with municipalities and private water companies, according to the launch.

“We have launched RS Contracting to create a company rooted in hard work, faith and commitment to excellence,” Rockholt said in the statement. “We are committed to delivering solutions of water and wastewater infrastructure that will be raised the harsh conditions of Arizona.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleEastern people: May 2025 | Engineering-Record News
Next Article Private delays, abandonments push the project stress
Machinery Asia
  • Website

Related Posts

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

June 21, 2025

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

June 21, 2025

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

June 21, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

Fisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work

Popular Posts

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

June 21, 2025

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

June 21, 2025

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

June 21, 2025

Fisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work

June 20, 2025
Heavy Machinery

7 Tips to maximize the life of the useful trailer tires

June 20, 2025

The smart way to transport vehicles

June 18, 2025

All you need to know about one -axis utility trailers

June 16, 2025

Smart choice for easy transportation from vehicles

June 16, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.