Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Tilbury Douglas reports £94m loss amid Interserve legacy costs
Industry News

Tilbury Douglas reports £94m loss amid Interserve legacy costs

Machinery AsiaBy Machinery AsiaOctober 6, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Tilbury Douglas made a pre-tax loss of £94m last year due to legacy costs associated with its separation from Interserve Group.

The firm also saw its turnover fall from £463.5m to £405.2m in the year ending 31 December 2022, with directors saying a fall in loading of work “reflected the difficulties experienced in gaining employment during 2021, arising from the uncertainties while still part of the Interserve group”. “.

The contractor, formerly one of the largest arms of Interserve plc, with a turnover of £3.2 billion, was demerged from the plc’s successor company, Interserve Group, in June 2022, although it is still owned of the same shareholders.

Revenue from its construction arm fell to £392m from £446.9m in 2021.

Tilbury Douglas Holdings Limited, which includes the mechanical, electrical and plumbing business of Tilbury Douglas Engineering, posted a pre-tax loss of £94m, compared with a profit of £11.2m last year previous year

Most of the loss came from a third-party buyout of its legacy pension scheme, which cost it £86.4m. The contractor stressed that this was “purely an accounting” rather than a cash or business loss. In the long term, the purchase removes your obligations from the scheme.

A further £14.7m of restructuring costs relate to other areas of its separation from Interserve Group.

Tilbury Douglas made an underlying operating profit of £6.2m, although that was still less than half the £12.7m posted in 2021.

The accounts also show he pocketed £16.5m in provisions, including £8m in unnamed onerous contracts and £7.5m in contract rectification.

The total includes money set aside to pay for the dispute it lost with Northumbrian Water along with former Interserve partner Doosan Enpure last year over cost overruns, delays and quality issues at the works of Horsley treatment in the Tyne Valley.

Chairman Nick Pollard said in a statement with the accounts: “The de-coupling of the pension scheme, together with the exit of Interserve Group, have removed large areas of uncertainty and placed the Tilbury Douglas Group on a strong footing.

“In summary, the new Tilbury Douglas group has returned to being a strongly traded prime contractor with a significant and growing order book, as shown by the underlying trading results.”

Pollard said the company expected its turnover to increase by 2023, forecasting revenues of £530m and a return to profitability.

In the accounts, chief executive Paul Gandy reiterated the contractor’s strategy to “continue to focus on those areas of construction in which it has a proven track record over many years”, adding that it “will not venture into areas where the risk profile of the projects is considered too high”.

Gandy first described the goal in an interview with Construction news in October 2022, where he highlighted that the business was “holding onto its fabric” by continuing to focus on health, education, roads and water, as well as airports, R&D and manufacturing

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThree states link offshore wind procurement to reduce costs
Next Article Mitigation of financial risks in modular construction
Machinery Asia
  • Website

Related Posts

The Supreme Court of the United States considers that Fluor Corp. is responsible for an employee involved in an attack injury in Afghanistan

April 25, 2026

The High Court rules that war zones do not exempt the contractor from culpability

April 24, 2026

Why Bechtel’s Craig Albert thinks construction schools need to evolve

April 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The Supreme Court of the United States considers that Fluor Corp. is responsible for an employee involved in an attack injury in Afghanistan

The High Court rules that war zones do not exempt the contractor from culpability

Why Bechtel’s Craig Albert thinks construction schools need to evolve

TerraPower begins construction of the US’s first commercial-scale advanced nuclear reactor

Popular Posts

The Supreme Court of the United States considers that Fluor Corp. is responsible for an employee involved in an attack injury in Afghanistan

April 25, 2026

The High Court rules that war zones do not exempt the contractor from culpability

April 24, 2026

Why Bechtel’s Craig Albert thinks construction schools need to evolve

April 24, 2026

TerraPower begins construction of the US’s first commercial-scale advanced nuclear reactor

April 24, 2026
Heavy Machinery

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.