Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Two injured in the collapse of a crane in Edinburgh
Industry News

Two injured in the collapse of a crane in Edinburgh

Machinery AsiaBy Machinery AsiaNovember 28, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Two people have been treated by paramedics after a crane collapsed on a building site in Edinburgh this morning.

The arm of a Jaso J380PA jib crane, owned and operated by Falcon Tower Crane Services, fell on the Stead’s Place residential development shortly before 9.30am today (November 28).

Emergency services were called to the scene in Leith shortly afterwards. The Scottish Ambulance Service said it sent two ambulances and its special operations team to the scene, where they treated two patients.

The scheme is being built by Collab Construction, a division of project developer Drum Property Group.

Firefighters have also been dispatched to the scene. A spokesman for the Scottish Fire and Rescue Service said: “Operations control mobilized four fire appliances and four specialist resources, where crews worked to support their partners.

“Firefighters left the scene after making sure the area was safe.”

A spokesman for the Health and Safety Executive said the regulator was aware of the incident and was making enquiries.

Construction on Stead’s Place began in July 2022 and is due to be completed by the middle of next year. The plan will include 110 rental homes on a 2.9-hectare former industrial estate.

A spokesman for Falcon Cranes said: “We will carry out the most comprehensive investigations to understand what caused the collapse.

“However, we can say that at this time we are not aware of any defects in the crane itself.”

Metnor Construction, which went into administration in February, was the previous main contractor on the project.

Map showing Stead’s Place in Leith, Edinburgh:

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe CTUIR receives a recycling grant from the feds
Next Article Best Highway/Bridge Project: SR-172 RR Crossing
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Why professional indemnity insurance is ticking the clock for AE firms

September 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

Critical Path | Engineering News-Register

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

Backhoe hits 50 Freeway overpass, breaks concrete

Popular Posts

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

September 26, 2026

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Backhoe hits 50 Freeway overpass, breaks concrete

September 26, 2026
Heavy Machinery

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.