Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Water/Environmental Merit – Yadkin Regional Water Supply Project
Industry News

Water/Environmental Merit – Yadkin Regional Water Supply Project

Machinery AsiaBy Machinery AsiaOctober 30, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Yadkin Regional Water Supply Project

Monroe, NC

Merit Award


Sent by: Union County Water

Owner: Union County, North Carolina

Main design company: Garney-Hazen/CDM Smith

General contractor: Garney-Hazen/CDM Smith

Civil, Structural, MEP Engineer: Garney-Hazen/CDM Smith

Program manager: HDR




Located next to Charlotte, Union County has grown exponentially over the past few decades. Because of this growth, county leaders sought a sustainable long-term water supply to meet current and future needs. With no viable source of drinking water within its corporate boundaries, Union County worked with neighboring entities to secure essential water resources for its residents.

The $303.8 million project ensures a long-term sustainable water supply for customers in the Yadkin River Basin of Union County. Among its benefits, the City of Norwood can access four times the amount of water compared to its previous facility. The new water catchment facility and increased capacity pumping station replaced World War II-era infrastructure that had not received major renovations since the 1980s. The project also provides the City of Norwood with a new monthly revenue stream. In addition, Stanly County now has access to 1.5 million gallons per day of treated drinking water in the City of Norwood. This amount increases to 2 MGD in 2033. As a result, the project also provides Stanly County with an ongoing revenue stream.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Water/Environment – Old Alabama Rd. 48 – Relocation of the water network
Next Article Clayco begins construction on $300 million hotel near SoFi Stadium
Machinery Asia
  • Website

Related Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

State Audit Clouds Future of Proposed NC Outer Banks Bridge

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

Grant Certainty emerges as new failure in talks on transport project

Popular Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.