Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Airport/Transit: South Coast Rail
Industry News

Award of Merit, Airport/Transit: South Coast Rail

Machinery AsiaBy Machinery AsiaNovember 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Southern Coast Railway


Fall River and New Bedford, Mass.


Merit Award


Presented by AECOM Tishman


Owner: Massachusetts Bay Transportation Authority


Main design company: VHB/HNTB joint venture


General contractor: Skanska-DW White Joint Venture


Civil Engineer: HBV


MEP Engineer: IMAGE


Architect: Fennick McCredie Architecture




The $1 million project restores commuter rail service between Boston and three previously underserved cities with nearly 40 miles of new track, six new stations, 12 bridges, 28 level crossings and two new stairwells.

The simultaneous development of multiple elements of modern suburban infrastructure in an active freight corridor required close coordination and sequenced construction activities. Early action packages, including culvert upgrades and replacements, procurement of track materials, and bridge replacements, helped reduce schedule risks and ease the way toward full construction.

Southern Coast Railway

Photo by Andy Ryan, courtesy of HNTB

The team reused more than 300,000 cubic yards of excavated materials over the course of the project, avoiding costly transportation of surplus soil to out-of-state landfills.

In New Bedford, accelerated bridge construction techniques and precast components expedited construction of a new web-tied arch pedestrian bridge with minimal disruption to traffic on the busy freeway below. The signature structure’s integrated lighting, landscaping and ADA-compliant access provide both functional utility and a visual gateway to the new downtown station.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Water/Environment: Fire Island
Next Article Award of Merit, Higher Education/Research: University of Vermont Athletic Campus Multipurpose Center
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.