Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » US uranium enrichment to be expanded
Industry News

US uranium enrichment to be expanded

Machinery AsiaBy Machinery AsiaJuly 3, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The operator of the National Enrichment Facility, the only commercial uranium enrichment site in the United States, has announced plans for a privately funded multibillion-dollar expansion at its Eunice, NM complex that would increase production of enriched uranium by 50%.

Urenco USA plans to begin construction in 2027 on a new process building that will house up to 24 gas centrifuge cascades for a total of 2.1 million work units of new enrichment capacity. The new falls would begin to occur in 2032, and others would be installed until 2036.

A spokesman said the company is weighing supply chain options for the expansion, including the selection of EPC contractors, and plans to complete it by 2027. “We are well into the design process for the new plant and expect to proceed quickly once we have selected supply chain partners,” the spokesman said.

In a separate upgrade project that will also begin next year, Urenco USA plans to restore the capacity of existing waterfalls at the facility. It has been operating since 2010 and has an existing annual capacity of 4.3 million separate work units, about one-third of current US demand. A 700,000-unit expansion that began last year in an existing building will be completed in 2027.

15
million separate work units of uranium enrichment capacity purchased by US civilian nuclear reactors in 2024; only 19% come from the US

Source: Latest data from the US Energy Information Administration

In addition to serving as the primary fuel for existing commercial light water nuclear reactors, which generate nearly 20% of US electricity, the low-enriched uranium produced at the facility will be an essential feedstock for producing high-assay low-enriched uranium for use in advanced reactor designs expected in the 2030s.

The US program is part of a larger effort by UK-based parent Urenco USA to add new beneficiation capacity at sites in the Americas and Europe over the next decade. It is also building a facility in England to convert more depleted uranium hexafluoride “tails” for later use, or into a chemically stable form for disposal.

Bechtel is providing front-end engineering and design services for the project.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAGC poll: Broad support for highway bill moving through Congress
Next Article East Africa’s $5.6 billion oil pipeline nears completion, with friends and foes watching
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.