Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Fluor, JGC win $7.5M contracts each on LNG Canada Phase 2 expansion
Industry News

Fluor, JGC win $7.5M contracts each on LNG Canada Phase 2 expansion

Machinery AsiaBy Machinery AsiaSeptember 30, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Expansion of LNG export facilities
Value: $7.5 billion for both Fluor and JGC
Location: Kitimat, British Columbia
Customer: LNG Canada

Fluor and JGC are staying for the next chapter of a multi-billion dollar energy build in Western Canada.

The joint venture will provide engineering, procurement, manufacturing, construction and commissioning for the second phase LNG Canada LNG Export Facility in Kitimat, British Columbia, according to a Tuesday news release from Fluor. The Irving, Texas-based contractor will set aside $7.5 billion for its portion of the contract in the third quarter of fiscal 2026.

Partner JGC, a contractor based in Yokohama, Japan, said separately that its part of the contract is also 7.5 billion dollarsaccording to its own announcement on Tuesday. According to Fluor, Fluor and JGC have a 50% stake in the execution of the JV expansion. The Canadian government estimates that the second phase will require about $23 billionreports Breos Finances.

The expansion will add two liquefaction units, known as trains, and an additional LNG storage tank, according to Fluor. The work will double the facility’s production capacity to around 28 million tonnes per year.

“LNG Canada Phase 1 was a historic achievement for Fluor, and we are excited to carry this momentum into the next chapter,” Fluor CEO Jim Breuer said in the statement. “The decision to proceed with Phase 2 reflects confidence in Canada’s ability to responsibly develop its natural gas resources and connect them to global markets.”

Fluor and JGC delivered the first phase of the installationwhich included engineering, procurement, manufacturing and construction. LNG production began in June 2025 and contractors completed delivery of the facility in October 2025, according to Fluor.

During this first phase, contractors employed modular construction in the construction of the LNG export facility. The team manufactured 215 modules overseas before shipping them to Kitimat, with the final module arriving from China in July 2023, according to Fluor.

LNG Canada is a joint venture of Shell, Petronas, PetroChina, Mitsubishi Corp. and Korea Gas Corp. Shell waits start commercial operations in the early 2030s, according to a Tuesday press release.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleKubota redesigns the subcompact segment with 5 new BX90 models
Next Article Construction layoffs hit lowest level since 2000
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.