Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit — Road/Bridge: Kirkman Highway Extension
Industry News

Award of Merit — Road/Bridge: Kirkman Highway Extension

Machinery AsiaBy Machinery AsiaOctober 16, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Widening of Kirkman Road

Orlando

Merit Award

Sent by: Johnson Bros. Corp., a Southland company

Owner: Universal City Development Partners Ltd.

Main design company: OM Engineering Services Inc.

General contractor: Johnson Bros. Corp., a Southland company

Structural Engineer: Parsons

This 1.7-mile stretch of urban highway closes a critical north-south gap in one of Central Florida’s busiest tourism corridors and improves regional mobility. Six general use lanes and two dedicated traffic lanes connect Carrier Drive to Universal Boulevard, creating a direct link between Universal Orlando Resort and the newly opened Epic Universe.

The $225.2 million project included massive earthworks, comprehensive stormwater and drainage systems, bridge and structure construction, and multiple paving operations. Crews also completed extensive utility relocations and graded traffic maintenance, as well as rebuilding a single-point urban interchange at West Sand Lake Road with prestressed Florida I-beam girders and a lightweight concrete deck.

Given the heavy traffic on the roadway, the project team implemented barrier-protected work zones and completed high-impact activities at night to reduce risk. Live high voltage transmission lines run through parts of this corridor, which required custom pile assembly operations using modified equipment with reduced clearances.

The signature traffic circle ramp at Epic Boulevard was redesigned from structural steel beams to Florida I-beam beams, eliminating specialized steel erection and reducing costs and utility conflicts. The change preserved the profile of the ramp while maintaining the separation between regional through traffic and local access.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit: Office/Retail/Mixed Use: Peabody Union
Next Article Case CE launches two new machines, updates compact wheel loaders
Machinery Asia
  • Website

Related Posts

Award of Merit — Manufacture: Spark Life Science

October 16, 2026

Award of Merit: Office/Retail/Mixed Use: Peabody Union

October 16, 2026

Award of Merit – Renovation/Restoration and Best Project – Security: The Poynor School of Innovation in Healthcare Historic Renovation

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Award of Merit — Manufacture: Spark Life Science

Case CE launches two new machines, updates compact wheel loaders

Award of Merit — Road/Bridge: Kirkman Highway Extension

Award of Merit: Office/Retail/Mixed Use: Peabody Union

Popular Posts

Award of Merit — Manufacture: Spark Life Science

October 16, 2026

Case CE launches two new machines, updates compact wheel loaders

October 16, 2026

Award of Merit — Road/Bridge: Kirkman Highway Extension

October 16, 2026

Award of Merit: Office/Retail/Mixed Use: Peabody Union

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.