Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » AIS wins $2 million in border infrastructure contracts
Industry News

AIS wins $2 million in border infrastructure contracts

Machinery AsiaBy Machinery AsiaDecember 19, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Border infrastructure projects
Value: Approximately $2 billion
Location: Eagle Pass, Texas; Lukeville, Arizona; Marron Valley and Campo, California
Customer: Department of National Security, Customs and Border Protection

AIS Infrastructure, a civil construction and heavy infrastructure company, has been awarded approximately $2 billion in contracts from the Department of Homeland Security and Customs and Border Protection, according to a Dec. 16 announcement shared with Construction Dive.

The projects are located along the southern US-Mexico border near Eagle Pass, Texas; Lukeville, Arizona; and Marron Valley and Campo, California, east of San Diego.

Chattanooga, Tenn.-based AIS will complete the work through a subsidiary, BCSS, according to the news release. BCSS will work in a joint venture with Montgomery, Ala.-based Caddell Construction and Burnet, Texas-based Gibraltar to lead and manage the four projects.

DHS and CBP have announced billions of dollars awards in Octoberi additional contracts in Decemberto hire companies to work along the southern border.

To that end, both Caddell Construction and Gibraltar are veterans of border work: Caddell was selected by CBP for build 14 miles of new contiguous border wall in 2020, while Gibraltar has worked on more than 30 border fence segments, according to the company’s website.

Other builders, such as Granite Construction of Watsonville, Calif., have also joined the fray. The infrastructure company won the contract for the first border wall of President Donald Trump’s second term in March.

Each of the four AIS Infrastructure projects are design-build efforts currently in the engineering phase, led by Omaha, Neb.-based HDR, according to the release. Field work is expected to begin in January 2026, and construction is expected to take between 30 and 36 months per project.

The specific locations listed in the release all have a border crossing or a Border Patrol presence.

Each contract and its scope includes:

  • DRT-1, $565 million, and DRT-2, $364 million, in Del Rio, Texas: focused on vertical and waterborne barriers, patrol roads, access routes and complex technical safety systems.
  • SDC-1, $483 million in San Diego, California: Covers vertical barriers, access to mountains and patrol roads, and advanced technical security systems.
  • TCA-1, $606 million in Tucson and Yuma, Arizona: Combining existing barrier wall improvements, new vertical barriers and drainage networks, extensive patrol and access, as well as advanced security and detection systems.

In addition, AIS Infrastructure plans to increase its workforce from 350 to 400 employees and deploy nearly 100 additional pieces of heavy equipment by March 2026 to meet the scale and complexity of the work, according to the announcement.

The company said it currently has $3.7 billion in indefinite delivery, indefinite-quantity contracts under review and feels well-positioned for the total $39 billion allocated to the federal border wall program.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFiscal year 2026 NDAA codified, blocking progressive construction design and multi-year authority
Next Article New York approves the existing building code
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.