Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » AOM Small Project: Restoration of Lake Marion
Industry News

AOM Small Project: Restoration of Lake Marion

Machinery AsiaBy Machinery AsiaOctober 8, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Restoration of Lake Marion

Severn, Md.

Merit Award

Sent by: BayLand Consultants & Designers Inc.

Owner: Provinces Civic Association

Road design and engineering company: BayLand Consultants & Designers Inc.

General contractor: pay dirt

Non-profit donors: Seven River Association and Arundel Rivers Foundation

Subcontractors: Ashton Manor Environmental; Xylem US Inc; AB Consultants Inc.

The project culminated a 20-year community-led effort to restore the 3-acre detention pond that had maintained a diminished ecological function. Removal of accumulated sediments restored the lake to its historic depth and re-established a permanent pool up to 8 feet deep. Forebays were constructed at primary entry points to capture sediment and reduce long-term maintenance requirements. A 20- to 30-foot-wide aquatic bank constructed around the perimeter of the lake and planted with native vegetation provides shallow-water habitat, promotes nutrient uptake and transformation, stabilizes slopes, and improves overall ecological diversity. The bank also acts as a buffer to intercept sediment and pollutants before they enter the main pool.

Reconstruction of the embankment required the installation of a 14-foot-deep cutting trench compacted to 95% to meet dam safety requirements. A temporary groundwater control system reduced inflow to normal levels, allowing for proper placement and compaction of materials while maintaining construction progress.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Sports/Entertainment: Atlantic Park | Engineering News-Register
Next Article De-risking the workforce gap: Can AI and robotics fill an immediate need?
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.