Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Data center construction spending soared 28% last year
Industry News

Data center construction spending soared 28% last year

Machinery AsiaBy Machinery AsiaJune 3, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive brief:

  • Expenses in the construction of the data center has risen 28.1% over the past year, reaching a seasonally adjusted annual rate of $50.7 billion in April, according to an analysis by Associated Builders and Contractors.
  • Outside of this boom, momentum elsewhere “has been hard to find,” said Anirban Basu, ABC’s chief economist. Non-residential construction spending rose just 0.1% month-on-month in April, according to the ABC report.
  • Public projects and data centers accounted for most of the nominal growth as private construction spending fell for a seventh straight month in April, the report said.

Diving knowledge:

The results suggest strong activity around fewer types of projects, primarily data centers, but also highway and infrastructure work, Basu said.

“Non-residential construction spending edged up in April, but this growth was entirely due to a sizeable increase in public sector activity,” Basu said. “Private-sector construction momentum has been hard to find outside of the still-rising data center segment.”

Much of that weakness comes from the manufacturing construction sector, Basu said. Spending on manufacturing projects fell 1.2% month-on-month in April and is down 18.4% over the past year. Commercial construction also fell, down 0.5% in April from March, according to the ABC report.

But data centers are still fueling optimism, even as the rest of the market weakens.

“These data center projects have boosted ABC’s construction backlog indicator and kept ABC members confident about their outlook, at least as a whole,” Basu said. “While this particular tailwind will persist for some time, rising material prices and a lack of momentum in many business segments may affect contractor sentiment.”

Government spending on construction rose 0.4% month-on-month in April and rose 3.7% from a year earlier, the data showed. The largest public category, highway and street construction, rose 0.4% month-on-month in April and 4% over the past year.

Lawmakers now face a Sept. 30 deadline to renew federal funding for surface transportation. The Associated General Contractors of America said the step is critical to maintain boost in highway construction.

“Any interruption in funding for these vital projects would force contractors to lay off construction workers and delay the purchase of needed equipment and materials,” said AGC CEO Jeffrey Shoaf. “This would be a major setback for the overall economy.”

The highways and streets segment alone accounts for more than a quarter of total public spending on construction, AGC reported.

“Highway construction has been a major contributor to total nonresidential spending,” said Ken Simonson, AGC’s chief economist. “Over the past few months, total spending has only increased when there was an increase in year-over-year highway construction activity.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article6 contech startups raise a total of $121 million
Next Article Startup Illoca brings the feeling of tracing paper to BIM/CAD design
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.