Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky
Industry News

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

Machinery AsiaBy Machinery AsiaJune 21, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A design has been selected for a new bridge that will connect Cincinnati and northern Kentucky on the Ohio river. Substantial construction is expected to begin by 2026 in the project, it is currently estimated to cost $ 3.6 billion.

The new bridge, a bridge accompanying to the Brent Spence bridge, will be located west of the existing cantilevered traffic bridge and will be a cable structure. Like the existing bridge, it will have two covers.

The joint company Walsh Kokosing is the progressive contractor of the Brent Spence Bridge’s overall design design team, which will cover five kilometers of Interstate in Kentucky, the new companion bridge and a mile of intersters in Ohio.

Aecom is the main designer, Jacobs is the main engineer and Parsons is the design quality company. The project is managed by a team formed by the Ohio (OLD) transport department and the Kentucky transport cabinet.

“As we went through the designs, we wanted that [companion] Bridge to be profitable, functional and safe, but we also wanted to look good, “said Ohio governor Mike Dewine in a statement.

“The design we chose was the only one that did not increase the cost and the time line to build,” adds Odot’s spokesman Matt Bruning. “It will be larger and will manage the traffic on the roads.”

Nocturnal view bridge looking north

The new bridge will help relieve the existing congestion.
Rendering courtesy of Ohio Dot/Kentucky transport cabinet

The cable stays design was selected from three designs considered to include a tied bow design and a cable -level bridge with a cable level with steel traffic.

It is estimated that the project will need six million hours worked for about 700 traders. The WalSH-Kokosing website lists bidding opportunities for the project.

The new bridge will have four lanes on each roof for the traffic of the interstate 71 and 75. The existing bridge that opened in 1963 will be reconfigured to add a shoulder that had previously been eliminated.

“In the 1980’s, the capacity was needed, so that their shoulders were removed and the bridge was four lanes in each direction,” says Bruning. “The reconfigured bridge will have three lanes and a shoulder, so there is a place to pull up and out of active traffic.”

The existing bridge was designed for 80,000 vehicles a day, but now manages 160,000 a day.

Other elements of the project include improvements to eight kilometers of road in Ohio and Kentucky, including the redesign of ramp configurations, new pedestrian paths and bicycles to connect communities and improve access to stops and traffic work.

The bridge has been in the works for about 20 years and has experienced several laps and turns, including in 2016 when Kentucky passed a law banning tolls on interstate bridges that connect Ohio and Kentucky. The new bridge will not have tolls.

The last turn occurred on June 19 when a lawsuit was filed in the southern district of Ohio by Covington, Ky. Lawyer Jamis Davis against Wal-Kokosing, Odot and others claiming that Walkosing renounced a agreement To hire it to supervise the hiring of small minority and female property companies, the disadvantaged program Business Enterprise (DBE).

Another litigation The hope of resolution was presented in October 2024, also in the southern district of Ohio, by the proponents of public traffic that states this The impacts on health and the environment were overlooked when the federal road administration

He issued a significant impact (Fonsi) impact instead of preparing a complete environmental impact statement.

The bridge is expected to open in 2032. Bruning assures that the cost of the project will be reviewed in the fall and can be readjusted.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work
Next Article 2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty
Machinery Asia
  • Website

Related Posts

The new head of the Panama Canal takes on the next wave of megaprojects

June 24, 2026

Q&A: The first woman administrator of the Panama Canal looks ahead

June 24, 2026

Contractor of choice for $1.4 million Blatnik Bridge replacement in Minnesota

June 23, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The new head of the Panama Canal takes on the next wave of megaprojects

Q&A: The first woman administrator of the Panama Canal looks ahead

What to check before towing a car trailer in the summer

Contractor of choice for $1.4 million Blatnik Bridge replacement in Minnesota

Popular Posts

The new head of the Panama Canal takes on the next wave of megaprojects

June 24, 2026

Q&A: The first woman administrator of the Panama Canal looks ahead

June 24, 2026

What to check before towing a car trailer in the summer

June 24, 2026

Contractor of choice for $1.4 million Blatnik Bridge replacement in Minnesota

June 23, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.