Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » US Commission asks Mexico to prioritize leaking sewage pipes in Tijuana River Valley
Industry News

US Commission asks Mexico to prioritize leaking sewage pipes in Tijuana River Valley

Machinery AsiaBy Machinery AsiaJune 2, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The U.S. Section of the International Water and Boundary Commission, an agency created by treaty to deal with water issues between Mexico and the U.S., reported on May 30 that two ruptures occurred in less than two weeks at a pipe system known as the Parallel Gravity Line that transports wastewater to the San Antonio de los Buenos sewage treatment plant near Tijuana.

Pipelines have failed with similar breaks over the past two decades. Mexican authorities are working on a new international sewer system to replace much of the aging infrastructure on their side of the border, but discharges into the Tijuana River continue to occur even though research has shown negative health impacts for residents on both sides of the border.

The exact reason for the most recent collapse is unknown, the US commission said, but the Mexican commission shut down several pumps along the border so crews can make repairs. The collectors intercept and divert cross-border flows of dry weather and sewage from Mexico to the South Bay Wastewater Treatment Plant on the US side of the border.

USIBWC commissioner Chad McIntosh contacted Mexican IBWC Commissioner Adriana Reséndez on May 31 to request a 24/7 effort on repairs and demanded that Mexico do everything possible to keep sewage out of the Tijuana River. Commissioner Reséndez said Mexican authorities are working on several fronts to try to get the job done as quickly as possible.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe integration of AI into work in the workplace will help drive the construction of AI
Next Article Cities push Congress to avoid water infrastructure funding cliff
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.