Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป 2024 Top 400 Sourcebook: EV Battery Plant Nears Production Start
Industry News

2024 Top 400 Sourcebook: EV Battery Plant Nears Production Start

Machinery AsiaBy Machinery AsiaSeptember 19, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Panasonic Energy Co.’s electric vehicle battery plant. $4 billion in De Soto, Kan., is taking shape with a goal of starting production early next year.

Work on the 300-acre site, which was formerly home to a US Army munitions plant, began in November 2022. Vertical construction led by a joint venture of Turner Construction Co. (No. 7 in manufacturing) and The Yates Co. Inc. (No. 4) started in April 2023.

Once completed, the 4.7 million square meter plant designed by SSOE Group with architect Mackenzie Inc. it would have a capacity of 30 GWh to manufacture batteries for electric vehicles. Panasonic aims to start production by the end of March 2025.

33%
The increase in manufacturing construction begins in July.

Source: Dodge Construction Network

The plant is designed with two wings and construction is planned to be completed in phases. Work is expected to continue on the second wing, now 44 percent complete, as production begins on the first, which is 99 percent complete, Panasonic said in its most recent progress update. Wing 1 deck is 43% complete.

The facility would be Panasonic’s second in the United States to produce its 2170 cylindrical lithium-ion batteries. It has another 38 GWh plant that produces the batteries in Nevada. Panasonic says locating another plant in the US will help it reduce emissions related to its supply chain.

The plant has already helped boost other local projects. Earlier this year, Kansas Gov. Laura Kelly announced that battery component maker H&T Recharge will invest $110 million to build a plant in De Soto that will supply the Panasonic plant. The electronics firm also agreed to contribute more than $165 million to finance several local infrastructure projects.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleVolvo ECR25 Electric compact excavator: Top Benefits
Next Article EXCAVATOR mitsubishi tolak pokok getah
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.