Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Best Project, Office/Retail/Mixed Use: 20 Massachusetts Avenue, NW
Industry News

Best Project, Office/Retail/Mixed Use: 20 Massachusetts Avenue, NW

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

20 Massachusetts Avenue, NW

Washington, D.C

BEST PROJECT


Sent by: DPR construction

Owner: The RMR group

Main design company: Leo A Daly

General contractor: DPR construction

Civil Engineer: Bohler DC

Structural Engineer: SK&A

MEP Engineer: Interface engineering

Landscape architect: Lee and Associates Inc.

Owner’s representative: Mark G. Anderson Consultants Inc.




In just over two years, the seven-story office building from the 1970s was reimagined as a 485,000 square meter mixed-use destination. It combines a 274-key luxury hotel with A-class office space, all complemented by many amenities. To achieve this unusual repositioning, the original exterior skin and interior were stripped down to the structural frame and concrete floor slabs. The project team then added three stories to the structure and expanded the footprint by one column bay, creating 101,000 square feet of new space.

20 Massachusetts Avenue, NW

Photo courtesy DPR Construction

Because the building’s trapezoidal shape limited natural light inside, the project team installed steel braces and cut out large sections of floor slabs to accommodate two atriums. A full-height 10-story atrium is topped with a 2,400-square-foot skylight; the second rises four stories. Auricle slab clippings and roof demolition generated 10,000 tonnes of concrete and other waste, of which 75% was recycled. Combined with a unified glass curtain wall facade, the once opaque concrete structure is flooded with natural light for a seamless connection between indoors and outdoors, the team says. The approach also reduced the depth on all sides of the building, allowing for an additional 60 rooms.

20 Massachusetts Avenue, NW

Photo courtesy DPR Construction

Achieving this $151.6 million transformation required addressing many unforeseen conditions, including undocumented asbestos, inconsistent floor slab flatness between columns, and a column grid line discrepancy that required adjustments to the stacked arrangement of the rooms. Virtual design and construction technology proved instrumental in addressing these and other issues and fostered collaborative problem solving to maintain the project schedule. A narrow alley with an active loading dock and garage adjacent to the building’s west facade required the use of precision-engineered precast facade panels to preserve access and ensure worker safety during construction.

20 Massachusetts Avenue, NW

Photo courtesy DPR Construction

Other features of 20 Massachusetts Avenue include a green roof with drought-resistant plantings, an integrated stormwater management system that reduces water consumption by 40%, and high-performance glazing that is expected to reduce the energy consumption by 20%. The project also marked the District of Columbia’s first installation of factory-custom bathroom pods, streamlining construction and minimizing waste. The 206 pods, which include Italian tiles, custom vanities and glass showers, were manufactured concurrently with the hotel’s construction phase.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMerit Award, Health Care: Center for Specialized Care in Child Health and Ambulatory Surgery of Nemours
Next Article Award of Merit, Renovation/Restoration: National Museum of Women in the Arts Renovation and Restoration
Machinery Asia
  • Website

Related Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

Lessons from the debate over Maine’s data center moratorium on construction

Construction views to the east | Engineering News-Register

Popular Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026

Construction views to the east | Engineering News-Register

May 1, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.