Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Jacobs reserves $267 million Navajo water treatment project
Industry News

Jacobs reserves $267 million Navajo water treatment project

Machinery AsiaBy Machinery AsiaOctober 22, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Water treatment plant
Value: 267 million dollars
Location: New Mexico
Customer: US Bureau of Claims

Funding from the Jobs and Infrastructure Investment Act is starting to make its way to more jobs, including a water project in New Mexico.

The United States Bureau of Claims selected Jacobs to design and build Sant Joan Lateral Water Treatment Plant in northwestern New Mexico, according to a news release. At $267 million, the project aims to provide clean water to more than 250,000 people in 43 Navajo chapters.

The plant addresses a longstanding water accessibility challenge in the region, said Greg Fischer, Jacobs vice president of design, construction, operations management and facilities services. Currently, the Navajo Nation estimates that more than one-third of households rely on hauling water to meet their daily needs, according to the release.

“Critical to improving the living conditions of Navajo communities, in addition to basic drinking water, this plant will provide water for commercial and retail businesses, healthcare, schools and other facilities,” Fischer said. “Our approach provides the Bureau of Reclamation with a more efficient way to provide the critical infrastructure needed to support long-term, reliable water for this community.”

Jacobs will design and build the plant to initially treat up to 18.8 million gallons of water per day, with future expansion to double that capacity. The project includes commissioning of the San Juan Lateral Distribution System and will involve ongoing operations and maintenance.

The San Juan Sidewater Treatment Plant is a major component of the Navajo-Gallup Water Supply Project. The project, funded in part by the Indian Water Rights Termination Fund through the IIJA, provides drinking water to the Navajo communities of Gallup, New Mexico, and Window Rock, Arizona.

Once completed, the water supply facility will divert 37,761 acre-feet of water annually from the San Juan River Basin. Jacobs will deliver two water treatment plants, along with nearly 300 miles of pipelines, 19 pumping plants and several storage tanks, according to the release.

Jacobs plans to begin initial water deliveries in late 2028 and expects to complete the entire project by late 2029.

Water projects continue to be a core part of the Jacobs portfolioCEO Bob Pragada said during the company’s most recent earnings call. Other recent industry awards include the Kranji Water Reclamation Plant in Singapore, Sewage treatment plants in Miami and work in progress Onondaga County, New York.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHelene Recovery progresses with water, road contracts
Next Article Autodesk advances Esri partnership and explains more about data strategy
Machinery Asia
  • Website

Related Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Court to general contractor: too late to claim 600,000 excess underpayment

The ice chapel built by a student duo stands tall at the University of Notre Dame

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Popular Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.