Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Tutor Perini subsidiary to dig $1.1 million water tunnel
Industry News

Tutor Perini subsidiary to dig $1.1 million water tunnel

Machinery AsiaBy Machinery AsiaOctober 24, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Kensico-Eastview Connecting Tunnel
Value: 1.1 billion dollars
Location: Westchester County, New York
Customer: New York City Department of Environmental Protection

Tutor Perini subsidiary Frontier-Kemper won a $1.1 billion contract to build a water tunnel to help strengthen New York City’s supply system.

The 2-mile-long Kensico-Eastview Connecting Tunnel will connect Kensico Reservoir near White Plains, New York, with the Catskill/Delaware UV Disinfection Facility, the the largest ultraviolet treatment plant in the worldat Eastview.

The facility offers specific treatment for cryptosporidium and giardia, naturally occurring microorganisms that can be found in surface water and can cause gastrointestinal illness. The tunnel will bring water to the facility’s 56 UV units, which neutralize these insects.

According to the city’s Department of Environmental Protection, the completed tunnel will be 27 feet in diameter and extend 400 feet to 500 feet below grade, with a capacity to carry 2.6 billion gallons of water each day.

The tunnel will help meet the future needs of the city and surrounding Westchester County, and is a critical addition to the water infrastructure that serves 9.1 million people in the region. It will be the largest water supply tunnel project in Westchester County since the 1940s and will allow other components of the system to be periodically taken offline for maintenance or inspection.

“The Kensico-Eastview Connection Project is an essential investment to ensure the long-term resiliency of New York City’s water supply system,” DEP Commissioner Rohit T. Aggarwala said in a statement l last year “By creating this vital link between the Kensico Reservoir and our UV treatment facilities, this new tunnel reinforces our commitment to providing consistent and reliable water delivery to New York City and its population centers growing in Westchester County.”

The tunnel must be completed before the construction of a cover over it Hillview Reservoir in Yonkersanother vital component of the system, DEP said.

Guardian Perini, based in Los Angeles, said Frontier-Kemper, which specializes in underground and heavy civil construction, including water supply and sewage transportation, will build the new deep rock tunnel. Work is expected to begin in the coming months and reach substantial completion by 2030.

Earlier this week, Guardian Perini warned investors that it would report a loss in its third-quarter earnings due to dispute charges on several projects, but that it would also post a record backlog of roughly $14 billion. The Kensico-Eastview Connection Tunnel award will be included in that total, the company said.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFeds grant $3.5 billion to expand and strengthen US power grid
Next Article Apprentices help workers see construction as their first choice
Machinery Asia
  • Website

Related Posts

From the Archive: August 16, 1984

May 23, 2026

Black & Veatch plans $1.34 million headquarters and mixed-use district in Kansas

May 23, 2026

D.C. agency chief defends pre-spill maintenance, but system repair far from over

May 22, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

From the Archive: August 16, 1984

Black & Veatch plans $1.34 million headquarters and mixed-use district in Kansas

D.C. agency chief defends pre-spill maintenance, but system repair far from over

Construction views to the east | Engineering News-Register

Popular Posts

From the Archive: August 16, 1984

May 23, 2026

Black & Veatch plans $1.34 million headquarters and mixed-use district in Kansas

May 23, 2026

D.C. agency chief defends pre-spill maintenance, but system repair far from over

May 22, 2026

Construction views to the east | Engineering News-Register

May 22, 2026
Heavy Machinery

What are the most durable materials used in the construction of car trailers

May 13, 2026

Which open vs enclosed car trailer makes sense for you

May 13, 2026

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.