Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Four convicted of fires that caused $ 10 million damage to Ohio’s Daniel Beard Bridge
Industry News

Four convicted of fires that caused $ 10 million damage to Ohio’s Daniel Beard Bridge

Machinery AsiaBy Machinery AsiaJune 27, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Four people have been convicted of a deliberately fire that caused $ 10 million damage to the Daniel Beard bridge last year.

The bridge, also known as the Big Mac bridge, is a 1,300 -foot twin bridge that carries eight lanes of the interstate 471 on the Ohio river between Cincinnati, Ohio and Newport, Ky.

The fire on November 1 was lit in a playground under the Sawyer Point Park bridge, which runs along the river to Cincinnati. The fire destroyed the courtyard and melted the bridge’s steel beams, causing traffic disorders for more than three months. Repair efforts took 100 days to complete -according to the Hamilton County Prosecutor’s Office.

Terry Stiles, 39, of Arlington Heights, Ohio, was found guilty of incorporating the fire as part of a supplication agreement. He was sentenced to nine years in federal prison. Zachary Stumpf, 23, from Owensville, Ohio, was sentenced to three years of obstruction of justice obstruction, Kaitlen Hall, 25, and James Hamilton, 26, both of Arlington Heights, were to blame for official business obstruction, a crime.

The Hamilton County prosecutor, Connie Pillich

He said the trio was looking for scooters to steal. Stiles set the fire by collecting remains in the playground under the bridge, lit with a lighter and then brushing it with his arm to sprinkle the waste, said Pillich.

“The cameras detected that the flames rose around 8 feet in the yard and rose in a few minutes,” he said.

When he confessed, Pillich said that Stiles admitted “to put many fires for years because he likes fires.”

As Red, Ohio’s transport department contracted Odot hired Hinckley, based in Ohio, The Great Lakes Construction Co. to make emergency repairs. The work included the replacement of some of the bridge’s steel beams, as well as an area of ​​the bridge roof and an overload sign. Drones and robots were used in the style of dogs equipped with Lidar scanners to evaluate the damage.

At a previous press conference, Cincinnatti City Manager, Sheryl Long, said that the fire caused flames that reached 40 feet heights, burning at extremely high temperatures and completely destroying the area under the bridge.

Pillich attributed the rapid rise in the fire to the playgrounds, including compound covers and recycled tires, both containing oil. He added, however, that “it was only because of a human who started the fire that the bridge was damaged.”

Hamilton was charged after the fact because he helped Stiles, Stumpf and Hall evading researchers, Pillich said.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTerex T-Torque Slewing Technology
Next Article Volvo SD110B soil compactor – Operator environment
Machinery Asia
  • Website

Related Posts

Border and data center work boosts Granite’s revenue

April 30, 2026

High Court rules war zones do not shield contractors from liability for employee misconduct

April 30, 2026

Middle East, Iran conflict and UAE mandate squeeze construction workforce

April 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Border and data center work boosts Granite’s revenue

High Court rules war zones do not shield contractors from liability for employee misconduct

Middle East, Iran conflict and UAE mandate squeeze construction workforce

DOT’s Record $774 Million Port Funding Round Likely Marks Highest Before IIJA Expires

Popular Posts

Border and data center work boosts Granite’s revenue

April 30, 2026

High Court rules war zones do not shield contractors from liability for employee misconduct

April 30, 2026

Middle East, Iran conflict and UAE mandate squeeze construction workforce

April 30, 2026

DOT’s Record $774 Million Port Funding Round Likely Marks Highest Before IIJA Expires

April 30, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.