Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Turning Gray Areas Green: Is Time Running Out for Net Zero?
Industry News

Turning Gray Areas Green: Is Time Running Out for Net Zero?

Machinery AsiaBy Machinery AsiaJune 20, 2023No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Jose Hernandez is director of sustainability and energy at the consultancy Pick Everard

The climate agenda continues to be a focus for the construction industry, marking one of the biggest challenges the sector has ever faced. Twenty-five per cent of the UK’s emissions are directly attributable to the built environment and we are reaching a critical point: the next 10 years will be decisive in meeting the targets. So is the hourglass dry?

Each passing day brings us closer to zero hour. Time certainly passes and delay has a double cost.

“Having a single net-zero construction standard reflects a broader collective drive to make a difference”

The first is the figurative cost of irreparable damage to the environment, which will have major implications for the way we live and inhabit the planet. In fact, we are already on the verge of some parts of the world being uninhabitable for humans, and without getting to zero as soon as possible, that risk will only increase.

Second, there is the financial cost to consider, especially for asset owners. To put it simply, it won’t be long before the cost of not decarbonizing exceeds the capital investment of decarbonizing in the first place. Changes to the minimum energy efficiency standard in April already mean landlords cannot rent non-domestic properties with an energy performance certificate rating worse than E without legislative exemptions.

It is fair to say that we will see more changes in this way in the coming years, which relates to the increased risk of stranded assets – those that can no longer be used for compliance purposes or are no longer classified as insurable Companies with large property portfolios are naturally at higher risk of this and need to be ahead of the decarbonisation curve.

Early involvement

All of this is fueling the resurgence of retrofitting and repurposing in recent years, and has seen businesses and organizations of all types and sizes making statements about climate change.

The most important point of all remains the first step: establish sustainability goals with the client and design team from the start of the work, and carry that thread through. But this must also encapsulate the early involvement of the contractor.

As well as being best practice as outlined in the Government Construction Manual Guide, early contractor involvement ensures that the careful balance of purpose, budget and stakeholder expectations can be delivered without compromise, eliminating embodied carbon results as far as possible and prioritizing realistic sustainability. measures and objectives at each stage.

Nineteen per cent of the UK’s carbon footprint is attributable to the operational demands of powering, heating and cooling our buildings, so energy strategies must be part of the equation to ensure a net zero asset in the future And we need to ensure that the move away from fossil fuels does not depend solely on the electricity grid, with multiple sources and storage having to be designed into the delivery of the schemes.

Clearer path forward

A big step is identifying what exactly it means for a building to be “net zero.” This has been a bit of a gray area, but it is becoming clearer with the UK Green Building Council bringing together leading organizations to create Britain’s first. Zero net carbon building standard.

This standard sets out metrics by which net zero carbon performance is assessed, along with performance targets or limits that must be met. Having a single standard that provides a clear definition of net zero buildings reflects a broader collective drive to make a difference. Crucially, it will provide consistency, level the measurement playing field and allow the industry to robustly verify that assets are net zero and in line with climate targets.

As we approach this “zero hour” point, the positive is that we are already on the way. The UK government put us at the forefront of the call for global climate action by being the first in the world to set the 2050 net zero target.

Indeed, many organizations and local authorities reflect the urgency to achieve net zero as soon as possible, setting targets closer to the next decade. We are on the way, but action is needed without delay and government funding is required to drive momentum towards challenging collective deadlines.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFinalists selected to design Global War on Terrorism Memorial
Next Article Polish American architect awarded with PhD from Boston Architectural College
Machinery Asia
  • Website

Related Posts

Second Avenue subway lawsuit tests federal grant limits after Gateway ruling

March 18, 2026

US offshore wind projects pass milestones and seek to avoid further Trump attacks

March 18, 2026

The research investigates the causes of the 2025 workplace landslide in Norway

March 18, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Second Avenue subway lawsuit tests federal grant limits after Gateway ruling

US offshore wind projects pass milestones and seek to avoid further Trump attacks

The research investigates the causes of the 2025 workplace landslide in Norway

Contractor sues over stalled Milwaukee timber tower, seeks $11.3 million and foreclosure

Popular Posts

Second Avenue subway lawsuit tests federal grant limits after Gateway ruling

March 18, 2026

US offshore wind projects pass milestones and seek to avoid further Trump attacks

March 18, 2026

The research investigates the causes of the 2025 workplace landslide in Norway

March 18, 2026

Contractor sues over stalled Milwaukee timber tower, seeks $11.3 million and foreclosure

March 18, 2026
Heavy Machinery

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Which material makes the car trailer steel or aluminum more durable

March 12, 2026

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.