Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award for Merit, Health Care: Hospital for Women and Children Sant Vicent Ascension
Industry News

Award for Merit, Health Care: Hospital for Women and Children Sant Vicent Ascension

Machinery AsiaBy Machinery AsiaNovember 11, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Hospital for Women and Children Ascension Sant Vicent


Indianapolis


Merit Award


Presented by Pepper construction


Owner: Medxcel


Main design company: CannonDesign


General contractor: Pepper Construction of Indiana


Civil Engineer: Kimley-Horn


Structural Engineer/MEP: CannonDesign




After progress on this $165 million hospital stalled for a year under a previous contractor, Pepper Construction took over and implemented an integrated project delivery model and 90-day action plan that saw site work begin after just 60 days, resulting in project completion in just over 22 months.

The result is an eight-story, 278,000-square-foot hospital with 109 rooms that is the first facility in Indiana to offer wall care, allowing high-risk mothers and their babies to remain together during their stay.

Strategic prefabrication in 41% of the project and lean construction practices made this speed-to-market project possible. Precast elements included exterior panels and key interior components, while a thermally broken cladding support system helped increase energy performance by combining the structural integrity of steel with the thermal insulating properties of fiberglass. And as part of the project’s sustainability effort, the design incorporated efficient, regionally sourced materials throughout the facility. Crews also diverted more than 250 tons of waste from landfills.

Although the project was completed over the original budget of $148 million, with a final cost of $165 million, this included additional scope approved by the owner, such as utility management of the chilled water system, hazardous waste disposal, and generator installation.

Facing many interesting challenges, the team delivered the project on time in January 2025.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Healthcare: UW Health Eastpark Medical Center
Next Article Award of Merit, Road/Bridge: US-169 Buck O’Neil Bridge Project
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.