Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Tariffs drive increased stress on construction projects
Industry News

Tariffs drive increased stress on construction projects

Machinery AsiaBy Machinery AsiaDecember 9, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Tariff pressure on construction costs led to an increase in project stress in November, according to the latest data from Cincinnati-based ConstructConnect.

The Project stress indexa measure of construction projects that have been delayed or abandoned, rose 19.9% ​​from October to November. The increase pushes the benchmark to about 25.7 percent above its 2021 baseline, said Devin Bell, associate economist at ConstructConnect.

“Tariffs have played a key role in defining abandonment activity in both the public and private sectors this year,” Bell told Construction Dive. “As companies use up their pre-Liberation Day stocks months after the initial rates went into effect, rising construction costs are pushing some property owners and developers to cancel projects. This pressure is already visible in the high abandonments in the private sector, and both sectors continue to perform well above their historical averages.”

Dropouts rose 41.1% in November, the report said, marking one of the biggest monthly jumps in the index this year. Abandoned projects also rose significantly, up 16.5% in November. Delays in tender dates were the only indicator to improve, falling 2.9% after a rise the previous month.

The public and private division again showed divergent pressures. Pending private projects increased by 252.6% compared to the same period last year. Meanwhile, pending public activity fell 19% year-on-year, according to the report.

Private project abandonments rose 5.7% year-on-year in November, compared with a 3.2% drop in public abandonments.

“Both pending activity and abandonment increased substantially, pushing the index to its highest level since the June spike,” Bell told Construction Dive. “Rising material and operations costs have intensified the economic uncertainty facing the construction industry, pushing stress indicators higher.” Overall stressful conditions are now 9.9% higher than in the same period in 2024, according to the report. Bell said those high costs and lingering economic uncertainty will challenge viability of the project by 2026.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleObituary: Frank Gehry, 96, architect who ushered construction into the digital age
Next Article December 2025 Industry News West: California Accepts Funds for Vincent Thomas Bridge Upgrades and Other Stories
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.