Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Best Project, Electrical/Industrial: Macau Waste Incineration Plant — Phase 3
Industry News

Best Project, Electrical/Industrial: Macau Waste Incineration Plant — Phase 3

Machinery AsiaBy Machinery AsiaDecember 13, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Macau Waste Incineration Plant – Phase 3

Macau, China

Best Project, Power/Industrial

Presented by China Harbor Engineering Co. Ltd

Owner: Environmental Protection Office, Macao Government Special Administrative Region

Main design company: AECOM Hong Kong

Contractor: China Port Engineering – Sanfeng Covanta Environmental Industry – Tongfang Environment – Four Major Facilities Management Joint Venture


The new phase of the Macau waste incineration plant increases the daily capacity to more than 3,000 tons at the only urban solid waste treatment facility in this special administrative region of China, first opened in 1992. The project includes waste reception, loading and incineration systems; waste heat recovery; steam turbine power; water and steam cooling; cleaning of combustion gases; and fly ash and slag handling, as well as a new electrical substation.

The project, completed ahead of schedule and on budget, includes a 25-ton-per-day hazardous waste treatment plant and allows for annual energy generation of 200 million kWh at full capacity.

The plant’s compact site, with highly integrated equipment and piping, presented challenges that required facilities “to be designed and built in a stacked manner,” the filing says.

Macau waste incineration plant

The expansion of the Macau incineration plant increases capacity to more than 3,000 tons per day and adds design features to reduce bulk in a tight location.
Photo by RuDong Zhao, China Harbor Engineering Co. Ltd.

“The design divides the exterior of the plant into four layers, reducing bulk and creating the stacked effect, which adds interest,” adds the team. Photovoltaic glass curtain walls between each “layer” provide natural light and ventilation to interior corridors, while glass, wood-like metal grating and steel give “a lighter, more modern look,” he notes. The design also reduces solar radiation and energy consumption. For sustainability, all wastewater from the plant is treated and reused and the administrative building has a rainwater collection system on the roof.

Macau waste incineration plant

Photovoltaic glass provides natural light and a more modern look, the team says, with the design also reducing solar radiation and energy consumption. Photo by RuDong Zhao, China Harbor Engineering Co. Ltd.

Crews used incremental casting and other construction methods in Macau for the first time to erect long-span steel roof trusses, as well as an intelligent anti-collision system to service five tower cranes in the tight space. The project team says it proactively increased the dynamic load test ratio of the stack base from 3% to 100%, ensuring that each stack fully meets its designed capacity. The project also employed multipurpose workforce safety and security programs.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Water/Wastewater: Arklow Wastewater Treatment Plant
Next Article Award of Merit, Sports/Entertainment: New Alamein City Tourist Promenade
Machinery Asia
  • Website

Related Posts

Gulf War Damage Creates $58 Million Repair Job, Global Construction Pressure

April 23, 2026

San Antonio military base weighs nuclear option for grid independence

April 23, 2026

Trump implements Defense Production Act to address energy project bottlenecks and grid equipment

April 23, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Gulf War Damage Creates $58 Million Repair Job, Global Construction Pressure

San Antonio military base weighs nuclear option for grid independence

Trump implements Defense Production Act to address energy project bottlenecks and grid equipment

Sociable: Meta starts 28th US data center

Popular Posts

Gulf War Damage Creates $58 Million Repair Job, Global Construction Pressure

April 23, 2026

San Antonio military base weighs nuclear option for grid independence

April 23, 2026

Trump implements Defense Production Act to address energy project bottlenecks and grid equipment

April 23, 2026

Sociable: Meta starts 28th US data center

April 23, 2026
Heavy Machinery

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.