Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » From the ENR Archive: August 18, 1955
Industry News

From the ENR Archive: August 18, 1955

Machinery AsiaBy Machinery AsiaFebruary 27, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

ENR 150th anniversary

This 1955 cover shows a supersonic wind tunnel under construction at the Ames Aeronautical Laboratory in Mountain View, California.

Now known as the Ames Research Center, it has been a major NASA research center since the agency’s founding in 1958.

The Ames Unitary Plan wind tunnel was designed for aerodynamic research, with air speeds in the transonic and supersonic ranges, up to 3.5 times the speed of sound. Wind tunnel circuits are huge steel ducts that follow rectangular planes.

Diameters vary from 20 feet to 70 feet and steel thickness ranges from 0.5 inches to 4.5 inches. It was made of 15,000 tons of heavy plates of low carbon steel that had good welding characteristics.

Cylindrical sections of steel plate were joined by automatic welding while slowly rotating, but much of the welding was done by hand. The welds were inspected by X-ray and magna flux, and the finished shells were vacuum tested.

The foundation was a challenge, as the underlying strata near San Francisco Bay consisted of alluvial fill and bay mud. About 1,700 piles were sunk to an average depth of 48 feet. Chicago Bridge & Iron Co. was a general contractor.

It remains NASA’s most widely used wind tunnel. All major commercial aircraft, most military aircraft, the Mercury, Gemini and Apollo spacecraft, as well as the space shuttle, were tested there.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHow to hire young workers before it’s too late
Next Article NLRB reverts to joint employer rule it crafted during Trump’s first term
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.