Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป EPA approves 13-acre PCB landfill in western Massachusetts
Industry News

EPA approves 13-acre PCB landfill in western Massachusetts

Machinery AsiaBy Machinery AsiaJune 15, 2026No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

After the approval of the Environmental Protection Agency a 13 acres landfill in western Massachusetts, cconstruction has begun on the facility that will do so contains 1.3 million cubic meters of polychlorinated biphenyl (PCB)-contaminated sediment from the Housatonic River.

General Electric expects the Lee, Massachusetts site to be completed by the end of 2027 and begin receiving sediment in 2028.

PCBs, used by General Electric in the manufacture of electrical transformers, were released into the river between the 1930s and 1970s and have been phased out for decades since then. In 2000, a consent decree forced General Electric to clean up the river, and in 2020 the company was ordered to build a new landfill.

A General Electric spokesperson said in an email to ENR, “Construction of a modern, safe facility … is a critical first step in implementing the US EPA-approved cleanup of the Housatonic River and its floodplains.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTutor Perini lands $652 million Guam military base project
Next Article The world’s longest submerged tunnel passes the milestone, but faces delays
Machinery Asia
  • Website

Related Posts

West Coast design firms regain their momentum

June 15, 2026

The world’s longest submerged tunnel passes the milestone, but faces delays

June 15, 2026

Tutor Perini lands $652 million Guam military base project

June 15, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

West Coast design firms regain their momentum

The world’s longest submerged tunnel passes the milestone, but faces delays

EPA approves 13-acre PCB landfill in western Massachusetts

Tutor Perini lands $652 million Guam military base project

Popular Posts

West Coast design firms regain their momentum

June 15, 2026

The world’s longest submerged tunnel passes the milestone, but faces delays

June 15, 2026

EPA approves 13-acre PCB landfill in western Massachusetts

June 15, 2026

Tutor Perini lands $652 million Guam military base project

June 15, 2026
Heavy Machinery

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

TYPHON Machinery Launches New xFlex Scissor Lift Series Designed for Safer and Smarter Modern Worksites

June 1, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.