Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Murphy wins a £93m job at Cambridge South Station
Industry News

Murphy wins a £93m job at Cambridge South Station

Machinery AsiaBy Machinery AsiaOctober 24, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Murphy has secured a £93.4m contract to build the new Cambridge South station.

The company, which is already carrying out preparatory work on the site, has been chosen by National Rail to deliver the station until completion, which is expected to be in 2025.

The two-storey, four-platform facility will improve access to the Cambridge Biomedical Campus, Europe’s largest medical and health sciences research centre, as well as supporting rapid growth in the area to the south from Cambridge city centre.

The enabling works already carried out on the site include the establishment of the site site, the installation of overhead line poles and the front walls of the platforms.

As well as delivering the new station with accessible facilities, Murphy will work with delivery partners Alstom and the South Rail Systems Alliance to improve rail infrastructure in the area.

These works will include the re-alignment of the existing track, the installation of two additional track loops, the modification of the railway on the southern approach to Cambridge station, the provision of overhead electrification infrastructure and the modification of existing signaling equipment.

The new facility, which is expected to serve 1.8 million passengers a year, will be Cambridge’s third station, acting as a key transport link between the biomedical campus and international gateways such as Stansted Airport and Eurostar.

It will also form part of the proposed route of the future East West Rail line connecting Oxford and Cambridge.

Katie Frost, Network Rail’s director of routes for Anglia, said the award of the delivery contract was a significant milestone for the Cambridge South project.

“I look forward to continuing to work with Murphy as we move into the main work phase and build on the initial enabling work that has already been delivered,” he said.

Murphy Project Director Joe Kennedy said: “[We have] It made significant progress in recent months in completing the enabling works, started the installation of the four platforms, the stacking of the station construction and carried out all the groundwork to facilitate the reorientation of the route during a blockade in December 2023″.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHomes England to lose 99.9% of investment after Ilke Homes heist
Next Article Boston’s Green Line extension faces more problems
Machinery Asia
  • Website

Related Posts

PFASs and project funding are key issues as drinking water suppliers gather

June 30, 2026

Tackle industry mega-problems by overcoming your own workplace fears, industry CEO tells GWIC

June 30, 2026

International Trade Commission opens investigation into Doosan Bobcat

June 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

PFASs and project funding are key issues as drinking water suppliers gather

Tackle industry mega-problems by overcoming your own workplace fears, industry CEO tells GWIC

International Trade Commission opens investigation into Doosan Bobcat

Construction job offers reach ’10 months maximum’

Popular Posts

PFASs and project funding are key issues as drinking water suppliers gather

June 30, 2026

Tackle industry mega-problems by overcoming your own workplace fears, industry CEO tells GWIC

June 30, 2026

International Trade Commission opens investigation into Doosan Bobcat

June 30, 2026

Construction job offers reach ’10 months maximum’

June 30, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.