Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » £400m off-site housing deal at stake
Industry News

£400m off-site housing deal at stake

Machinery AsiaBy Machinery AsiaNovember 29, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A frame supplier has announced £400m of off-site residential construction work.

Warrington-based Procurement for Housing said the deal would be split into two lots – one covering low-rise units such as bungalows and the other focusing on apartment blocks.

The social housing specialist, which is backed by the National Housing Federation and the Chartered Institute of Housing, hopes the framework will boost the use of modern construction methods (MMC) in the sector.

It aims to appoint a supplier for the first batch of £200m over a four-year period, which could be doubled through extensions.

The contract notice adds that a single contractor will also be appointed for the second £200m tranche, which has the same timescales.

Companies have until January 5 to express their interest in the work.

Any registered social landlord or other public bodies that join Housing Contracting during the life of the framework can use it to find contractors. Individual works could be awarded turnkey or supply only, as well as agreed variations.

Prime contractor figures told a parliamentary committee last week that the cash flow model used in public procurement was not fit to promote MMC.

The offsite sector has had a series of setbacks in recent times.

Legal & General Homes Modular, which launched in 2016 with plans to “modernize the housebuilding industry”, this month said it will end in June 2025.

Urban Splash’s modular spin-off went into administration in May 2022, citing operational problems at its Alfreton factory, while Midlands-based manufacturing specialist Caledonian Modular collapsed in March passed before being bought by JRL a few weeks later.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFlorida law would allow minors to do roofing work
Next Article Cardi stops work on its $116.5 million MassDOT highway contract
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.