Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Specialized construction: Coastal cold storage
Industry News

Award of Merit, Specialized construction: Coastal cold storage

Machinery AsiaBy Machinery AsiaNovember 11, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Coastal cold storage


Foristell, Mo.


Merit Award


Presented by Brinkmann constructors


Owner: Coastal Carriers Truck Lines LLC/Coastal Cold Storage LLC


Main design company: Answers Inc.


General contractor: Brinkmann constructors


Civil Engineer: Cochran Engineering


Structural Engineer: Case Engineering Inc.




Foristell, Missouri has a new 127,000 square foot state-of-the-art distribution center to help meet the growing demand for industrial cold storage solutions in the region. This $20 million facility, the first of three planned phases, was completed after nine months in December 2024.

The warehouse includes a 55,600-square-foot freezer, a 29,300-square-foot cooler with a 42-foot headroom, a 23,500-square-foot cold dock that extends 70 feet deep, and a capacity of 16,500 pallets. The facility also has an office and support area of ​​8,600 square meters.

In addition to meeting demanding operational requirements, the project incorporated energy-efficient construction practices, advanced cooling technology and optimized storage configurations.

Initial plans specified the use of insulated metal panels for all cold storage areas, but the project team redesigned the dock and maintenance areas to use Thermomass insulated tilting concrete walls. This modification resulted in substantial cost savings, reduced construction time, and provided a more durable solution for two critical high-traffic spaces: the 70-foot-deep dock and the 7,500-square-foot maintenance area.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Office/Retail/Mixed Use: New Cincinnati Public Radio Headquarters
Next Article EPA and states poised to finalize revised Chesapeake Bay agreement
Machinery Asia
  • Website

Related Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

What is the safest speed for hauling car trailers

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

Popular Posts

What is the safest speed for hauling car trailers

February 28, 2026

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Heavy Machinery

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.