Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Specialized construction: Coastal cold storage
Industry News

Award of Merit, Specialized construction: Coastal cold storage

Machinery AsiaBy Machinery AsiaNovember 11, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Coastal cold storage


Foristell, Mo.


Merit Award


Presented by Brinkmann constructors


Owner: Coastal Carriers Truck Lines LLC/Coastal Cold Storage LLC


Main design company: Answers Inc.


General contractor: Brinkmann constructors


Civil Engineer: Cochran Engineering


Structural Engineer: Case Engineering Inc.




Foristell, Missouri has a new 127,000 square foot state-of-the-art distribution center to help meet the growing demand for industrial cold storage solutions in the region. This $20 million facility, the first of three planned phases, was completed after nine months in December 2024.

The warehouse includes a 55,600-square-foot freezer, a 29,300-square-foot cooler with a 42-foot headroom, a 23,500-square-foot cold dock that extends 70 feet deep, and a capacity of 16,500 pallets. The facility also has an office and support area of ​​8,600 square meters.

In addition to meeting demanding operational requirements, the project incorporated energy-efficient construction practices, advanced cooling technology and optimized storage configurations.

Initial plans specified the use of insulated metal panels for all cold storage areas, but the project team redesigned the dock and maintenance areas to use Thermomass insulated tilting concrete walls. This modification resulted in substantial cost savings, reduced construction time, and provided a more durable solution for two critical high-traffic spaces: the 70-foot-deep dock and the 7,500-square-foot maintenance area.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Office/Retail/Mixed Use: New Cincinnati Public Radio Headquarters
Next Article EPA and states poised to finalize revised Chesapeake Bay agreement
Machinery Asia
  • Website

Related Posts

Walsh-Turner JV gets green light on $580 million utility plant project

June 18, 2026

June 18, 2026

Security is not a cost. It is one of the biggest generators of construction profits.

June 18, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Walsh-Turner JV gets green light on $580 million utility plant project

Security is not a cost. It is one of the biggest generators of construction profits.

Hilton Boston Back Bay completes a multi-million dollar renovation, emphasizing wellness

Popular Posts

Walsh-Turner JV gets green light on $580 million utility plant project

June 18, 2026

June 18, 2026

Security is not a cost. It is one of the biggest generators of construction profits.

June 18, 2026

Hilton Boston Back Bay completes a multi-million dollar renovation, emphasizing wellness

June 18, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.