Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Water/Environment Merit Award: La Pine Water and Wastewater Systems Improvement Project (WWSI)
Industry News

Water/Environment Merit Award: La Pine Water and Wastewater Systems Improvement Project (WWSI)

Machinery AsiaBy Machinery AsiaDecember 16, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

La Pine Water and Wastewater Systems Improvement (WWSI) Project.


La Pine, Ore.


Merit Award


Presented by Taylor Northwest


owner City of La Pine


Leading design company/Civil Anderson Perry & Associates Inc.


General Contractor Taylor Northwest


MEP engineer Electro Tech Engineering Inc.


Subcontractors Tri County Paving; McKenzie Falls; Anderson Erosion Control; T-Bailey; Bomba Abbas; Mikes Fence; Civil Cascade; Stadeli Boring & Tunneling; On the Fly Plumbing




For decades, the City of La Pine faced a critical public health and environmental challenge due to widespread reliance on aging and failing septic systems. Groundwater studies also revealed elevated nitrate levels in residential wells, a direct result of septic tank drainfields located near shallow wells.

In response, the city began a $37.1 million, decade-long effort to replace septic systems with a centralized sewer system and to install new drinking water infrastructure. The project resulted in nearly 300 properties being connected to the city’s municipal water and sewer systems.

The comprehensive scope included upgrading the existing wastewater treatment facility with a new 20-acre effluent storage lagoon, irrigation pumping station, and two 100-acre central irrigation pivots. Crews also built a 500,000-gallon welded steel water storage tank with well pump upgrades and transmission and collection systems installed in two neighborhoods.

Unforeseen cultural artifacts regularly turned up during construction, but rather than let the discoveries derail the schedule, crews remained flexible and moved to other areas while the artifacts were recovered.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Office/Retail/Mixed Use: Splash
Next Article Merit Award, Residential/Hostel: El Confidencial
Machinery Asia
  • Website

Related Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Court to general contractor: too late to claim 600,000 excess underpayment

The ice chapel built by a student duo stands tall at the University of Notre Dame

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Popular Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.