Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » US-Israel joint venture unveils plan for $1 million desalination plant in South Texas
Industry News

US-Israel joint venture unveils plan for $1 million desalination plant in South Texas

Machinery AsiaBy Machinery AsiaMay 5, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

US Desalination LLC and IDE Technologies have formed a new joint venture, RGV-Desal LLC, to advance a proposed seawater desalination plant in Texas’ Rio Grande Valley that would produce up to 50 million gallons per day.

Announced April 23, the company would oversee the design, financing and long-term operation of the facility, which it describes as a major “drought-proof” addition to municipal and industrial water supplies in the South Padre Island area.

IDE Technologies is a leading desalination developer based in Israel with a long history of designing and operating large-scale seawater treatment plants globally, including the record-breaking Carlsbad plant in Southern California, which opened in 2015 and now provides 10% of the regional water supply. Its participation reflects its role as a technology provider and co-developer, while Houston-based US Desalination LLC serves as a national partner.

The project is described as a roughly $1 billion private investment, with initial conceptual materials indicating it could be expanded to 100 million gallons per day in later phases, according to the Rio Grande Valley Business Journal. The outlet also reports that developers have secured land near the planned second causeway to South Father Island and discussed routing a transportation pipeline along the new bridge structure.

The companies say the plant would rely on seawater reverse osmosis backed by energy recovery systems to reduce the facility’s substantial energy demand. Although developers have referenced a three-to-five-year development period, no permitting agency has confirmed a timeline, and no detailed milestones have been released beyond the initial announcement.

The proposal builds on decades of regional interest in desalination. The Texas Water Development Board has noted that the Laguna Madre Water District previously explored marine desalination as a strategy to address recurring hydrologic volatility in the Lower Rio Grande region. According to The Monitor and Valley Morning Star, judges in Cameron and Hidalgo counties have publicly supported the project, citing long-term water supply issues and the declining reliability of Rio Grande flows.

Despite the scale of the project, stakeholders say a lack of technical detail remains a central issue. No information has been released on dam design, brine management, or site-specific environmental impacts. The Sierra Club’s Cyrus Reed said the absence of publicly available data makes it difficult to assess the proposal’s footprint, adding that “the devil is in the details.”

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleShell nears launch of $1.17bn Dutch green hydrogen project
Next Article Ontario’s $9.8 billion transmission plan targets grid bottleneck in Toronto
Machinery Asia
  • Website

Related Posts

Project cost, risk responsibility was discussed at the Resilience Conference

June 19, 2026

Clayco recruits former OpenAI executive Zack Kass as board advisor

June 19, 2026

Saudi Arabia’s Qiddiya plans 33,000-seat tennis center with retractable roof venues

June 19, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Project cost, risk responsibility was discussed at the Resilience Conference

Clayco recruits former OpenAI executive Zack Kass as board advisor

Saudi Arabia’s Qiddiya plans 33,000-seat tennis center with retractable roof venues

Project cost, risk responsibility was discussed at the Resilience Conference

Popular Posts

Project cost, risk responsibility was discussed at the Resilience Conference

June 19, 2026

Clayco recruits former OpenAI executive Zack Kass as board advisor

June 19, 2026

Saudi Arabia’s Qiddiya plans 33,000-seat tennis center with retractable roof venues

June 19, 2026

Project cost, risk responsibility was discussed at the Resilience Conference

June 19, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.