Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » A construction worker falls six stories into the Obama Presidential Center in Chicago
Industry News

A construction worker falls six stories into the Obama Presidential Center in Chicago

Machinery AsiaBy Machinery AsiaJanuary 23, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A construction worker fell down a ventilation shaft on Jan. 23 while working on the Obama Presidential Center, built by joint venture contractor Lakeside Alliance, in Chicago’s Hyde Park neighborhood.

The Chicago Fire Department responded around 1:05 p.m. to the scene on 60th Stony Island Street and Avenue where the worker, who has not been identified, was found in the basement of the museum building under construction.

“He was inside the duct,” the fire department said. spokesman Larry Langford. “We cut it and took it out.”

The worker had fallen from the sixth floor.

“He fell into a vent that’s tilted back and forth, so it wasn’t a straight fall,” Langford said.

A statement from the Lakeside Alliance said the worker was installing insulation inside the ventilation shaft and after the accident was “conscious, alert and transported to the University of Chicago Medical Center for assessment and care”. The Obama Center is being built next to the University of Chicago campus; the medical center is nearby.

Lakeside Alliance is a joint venture of construction companies Brown & Momen, Power & Sons Construction, Safeway Construction and UJAMAA Construction, who are joining with Turner Construction to build the Obama Center. The center’s campus will span 19 acres, including a museum, an auditorium, a branch of the Chicago Public Library, an athletic facility, and a fruit and vegetable garden.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleDespite Trump’s orders, DBE is not dead yet
Next Article 7 mixed use projects to see 2025
Machinery Asia
  • Website

Related Posts

Hudson, NH Completing repairs to Veterans Memorial Bridge girder cracks

October 1, 2026

The future of construction AI will be built on jobsites

October 1, 2026

GAO report finds review process too long for risk mitigation projects in US

October 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Hudson, NH Completing repairs to Veterans Memorial Bridge girder cracks

The future of construction AI will be built on jobsites

GAO report finds review process too long for risk mitigation projects in US

New York City ballot proposals designed to expedite construction

Popular Posts

Hudson, NH Completing repairs to Veterans Memorial Bridge girder cracks

October 1, 2026

The future of construction AI will be built on jobsites

October 1, 2026

GAO report finds review process too long for risk mitigation projects in US

October 1, 2026

New York City ballot proposals designed to expedite construction

October 1, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.