Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Energy/Industrial: Murphy Project
Industry News

Award of Merit, Energy/Industrial: Murphy Project

Machinery AsiaBy Machinery AsiaDecember 16, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Project Murphy


Central Point, Ore.


Merit Award


Presented by Layton Construction


owner BH Devco


Leading design company SGA Design Group


General Contractor Layton Construction



Completed on time and under budget in June 2024, this 87,750 square meter warehouse ensures that Amazon customers in rural areas receive the same level of service as those in metropolitan centres.

Facilities include office space, employee break rooms and restrooms that support daily operations, plus a 35,589 square meter launch pad that provides a sheltered stage for vehicles and packages.

The project also included extensive site infrastructure, from a new public road connecting Federal Way to Table Rock Road to traffic signal modifications, utilities and landscape improvements.

The site’s existing soil already had little resistance, but the situation was exacerbated by heavy rains, creating muddy and unstable ground that complicated logistics, deliveries and access to the site.

As part of the project’s ground improvement strategy, crews installed geo-aggregate piers in the building’s deck and deck areas and implemented cement-treated floors throughout the building’s deck, canopy, parking lot and driveway areas, ensuring the foundation could safely support the construction crew and the completed facility.

The project achieved over 76,000 hours of work with zero recordable incidents or lost time.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleGlobal efforts continue to improve road safety, resilience and maintenance
Next Article Best Higher Education/Research Excellence in Sustainability: Washington State University Vancouver Life Sciences Building
Machinery Asia
  • Website

Related Posts

California High-Speed ​​Rail Awards Track Contract and other news

June 17, 2026

Infrastructure works grow as people move inland

June 17, 2026

Resource management | Engineering News-Register

June 17, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

California High-Speed ​​Rail Awards Track Contract and other news

Infrastructure works grow as people move inland

Resource management | Engineering News-Register

Execution of the project | Engineering News-Register

Popular Posts

California High-Speed ​​Rail Awards Track Contract and other news

June 17, 2026

Infrastructure works grow as people move inland

June 17, 2026

Resource management | Engineering News-Register

June 17, 2026

Execution of the project | Engineering News-Register

June 17, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.