Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Best Landscape/Urban Development: Exploration Green Detention Center
Industry News

Best Landscape/Urban Development: Exploration Green Detention Center

Machinery AsiaBy Machinery AsiaNovember 26, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

EXPLORATION OF GREEN DETENTION

Houston

BEST PROJECT


Sent by: Lockwood, Andrews & Newnam Inc.

OWNER Clear Lake City Water Authority

DESIGN MANAGER/PROJECT MANAGER Lockwood, Andrews and Newnam

GENERAL CONTRACTORS Serco Construction Group; Triple B Services; LECON Inc.; Paskey Inc.




This transformative flood control and community recreation project transformed a former golf course into a multi-functional nature park and stormwater detention facility. The project includes five detention ponds with a combined storage capacity of 500 million gallons, capable of holding a 100-year storm.

Exploration Green serves as a model for urban flood control and community development, showing how engineering can combine flood protection with recreational and environmental benefits.

This design was proven effective during Hurricane Harvey, protecting over 150 homes while only 80% were completed. Beyond flood mitigation, the Exploration Green offers recreational amenities, including 6.1 miles of ADA-compliant hiking and biking trails, two sports fields, and recreation areas. The project also created 153 acres of natural habitat.

Exploration Green Detention Facility

Photo courtesy of Lockwood, Andrews & Newnam Inc

Crews managed site drainage and groundwater during excavation by installing culverts and relocating wet soils, ensuring continued progress despite adverse conditions. Located in a residential area with streets leading to several schools, the project also required detailed traffic control plans to ensure safety and minimize disruption. The project was completed under budget at $46.71 million against an estimated $53.65 million.

Unlike traditional detention facilities, these ponds hold water year-round, simulating natural lakes and enhancing aesthetic and recreational value. The design of the ponds includes multiple shelves for different areas of vegetation, integrating wetlands that naturally treat stormwater and prevent pollutants from entering local waterways. This approach to sustainability extends to the irrigation system, which uses reclaimed water to maintain pond ecosystems.

The project’s success has led the Clear Lake City Water Authority to open-source its design on the project’s website, with the hope that others will use the project as an example. Flood-prone communities in the Houston region are already on the brink, as are other communities in Texas and around the country, including Michigan, Virginia and Florida.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest K-12 Education: Dallas College Natatorium
Next Article Best Manufacturing: Propel Park, Phase 1
Machinery Asia
  • Website

Related Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

State Audit Clouds Future of Proposed NC Outer Banks Bridge

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

Grant Certainty emerges as new failure in talks on transport project

Popular Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.