Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Best Project, Railway/Traffic: North Extension of the COSAC Corridor, Naranjal Station to Av. Chimpu Eye
Industry News

Best Project, Railway/Traffic: North Extension of the COSAC Corridor, Naranjal Station to Av. Chimpu Eye

Machinery AsiaBy Machinery AsiaDecember 14, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

North Extension of the COSAC Corridor, Naranjal Station to Av. Chimpu Eye

Lima, Peru

Best Project


Sent by: OHLA

Owner: Municipal Company for Strategic Project Support (EMAPE)

Leading design company | Civil, structural and MEP engineer: Barriga – Dall’orto SA

General contractor: Obrascon Huarte Lain Peru Branch (OHLA)




The expansion of Lima’s integrated public transport system extends 10.2 km through the districts of Comas and Carabayllo in the Northern Cone of Peru’s capital and largest city, an area previously known for chaotic traffic, numerous bus services informal private and the presence of organized crime. It was a conflict zone that posed significant risks for the safety of workers and for the construction of the new connector.

The project, known as the High Capacity North Corridor Extension, or by its Spanish acronym, COSAC, was built by a team led by contractor Obrascon Huarte Lain Sucursal del Peru (OHLA). It includes a 10.2 km segregated bus lane for use only by public transport buses within the central median of the city’s roads. The work also included the construction of two main lanes, two side dividers and two service lanes adjacent to property lines.

Northern Extension of the COSAC Corridor

The terminal station of Chimpu Ocllo (above) is part of the North Corridor of the COSAC (right). The workshop yard was once a landfill.
Photo courtesy of OHLA

The team also designed and built 17 stations equipped with access ramps, control modules, boarding modules and maneuvering areas for buses, part of the $538 million project that has been adding public transit routes to Lima since 2010.

OHLA employed local labor, with a workforce development program that included training. The construction of modern infrastructure with large garden areas was also beneficial to the economically depressed communities of the city such as Comas and Carabayllo. Throughout all traffic was managed.

Northern Extension of the COSAC Corridor

Photo courtesy of OHLA

“Ensuring smooth traffic flow during construction was a major challenge,” OHLA noted in the competition entry form. “Twelve traffic diversion plans were implemented in phases, directing construction activities through clearly delineated sectors, monitored at intersections.”

The construction of urban green spaces reduced the levels of dust in the air, causing respiratory diseases. Systems were implemented to reinforce the foundation soil and control settlement to mitigate construction in a workshop dump and project maintenance yard. In total, OHLA built more than 180,000 square meters of green areas and a new wastewater treatment plant as part of the project. The treated water is now used to water the plants. The planned deadline and budget have been met.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article4Q Cost Report: Construction Starts See Small Growth in 2024
Next Article Best Project, Specialized Construction: Wenchi – Dendi Ecotourism Road Network Lot-1
Machinery Asia
  • Website

Related Posts

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

June 26, 2026

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

June 26, 2026

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

June 25, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

Energy Department offers $17.5 million carrot to speed up nuclear plant components and projects

Popular Posts

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

June 26, 2026

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

June 26, 2026

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

June 25, 2026

Energy Department offers $17.5 million carrot to speed up nuclear plant components and projects

June 25, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.