Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Excellence in Security – UVA Inn at Darden – The Forum Hotel
Industry News

Excellence in Security – UVA Inn at Darden – The Forum Hotel

Machinery AsiaBy Machinery AsiaMarch 8, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

UVA Inn at Darden – The Forum Hotel

Charlottesville, Va.

Excellence in security

Presented by: WM Jordan Co.

Region: ENR Mid-Atlantic


Owner: UVA Darden School Foundation

Main design company: Cooper Carry

General contractor: WM Jordan Co.

Civil engineer: HBV

Structural engineer: Uzun & Case LLC

MEP Engineer: Barrett Woodyard and Associates

Developer: Matthews Development Co.

Owner’s representative: Dear Body



Subcontractors: Moore’s Electrical & Mechanical Construction Inc.; Donley’s Inc.; Faulconer Construction Co.; Steel Liphart; Roof Services Corp.; Campostella Builders and Supply Corp.; Masonomics Inc.; Pompeii Inc.; James River Nurseries

For the Inn at Darden University of Virginia – The Forum Hotel in Charlottesville, Va., “We had to contend with a lot of unforeseen conditions,” including rocks, unstable ground and COVID-19, says Patrick Barbier, senior project manager of construction venture manager WM Jordan Co., of the 200,585-square-foot, 199-key boutique hotel that includes a conference wing, a main house and a residence wing.

The biggest challenge started early and added more than a month to the schedule. During excavation, problems with unstable ground required rock removal from the slab area of ​​the lecture wing. The revised design required drilling 60 feet to 70 feet to reach bedrock, doubling the number of deep foundations. The project recovered three weeks of schedule when the MEP and structural trades reduced the size of concrete placements but increased their frequency from one to three times per week.

Barbier said the team opted for a “different mindset” at safety. During weekly visits with trade foremen, for example, the group was on the lookout for potential safety improvements. The project underwent a voluntary Virginia Occupational Safety and Health Inspection, which resulted in no problems. During the project’s 1.35 million work hours, the team saw no OSHA recordable incidents or lost time accidents.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Interior/Tenant Improvement – Memorial Hermann Texas Medical Center Electrophysiology Laboratory and Surgical Services Expansion
Next Article Best small project – Hybrid Operating Room of the Primary Children’s Hospital
Machinery Asia
  • Website

Related Posts

US Supreme Court sides with Trump to end protections for Haitians and Syrians

June 27, 2026

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

US Supreme Court sides with Trump to end protections for Haitians and Syrians

John Deere is betting that building connected roads is its next competitive advantage

Buildots launches Intelligence Lab, an AI-powered project data research center

$26.2M North Texas EOC Debuts as World Cup Command Center

Popular Posts

US Supreme Court sides with Trump to end protections for Haitians and Syrians

June 27, 2026

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026

$26.2M North Texas EOC Debuts as World Cup Command Center

June 26, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.