Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Flatiron Breaks Ground on New $2.5 Million North Carolina Highway Segment
Industry News

Flatiron Breaks Ground on New $2.5 Million North Carolina Highway Segment

Machinery AsiaBy Machinery AsiaMarch 1, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A joint venture of Flatiron Construction Corp. and Fred Smith Co., along with lead designer ICE of the Carolinas, is advancing a $449.9 million section of North Carolina’s $2.5 million Complete 540 project through design and preconstruction. The contract comes as the project nears milestones of completing Phase 1 and beginning construction on Phase 2 this year.

The North Carolina Department of Transportation (NCDOT) and NC Turnpike Authority’s Complete 540 project is expanding the Triangle Expressway, also known as State Route 540, to make it a complete loop around the Raleigh area.

This is the first of two projects planned in Phase 2 of the project and covers about 6.6 miles of six-lane divided highway plus three interchanges in Wake County. The scope of the contract also includes the construction of 19 bridges and the rehabilitation and widening of an existing Interstate 540 bridge over Interstate 87.

complete_540_map.jpgThe Complete 540 project is being built in five segments. Map courtesy of the North Carolina Department of Transportation

The team plans to use a “superior” design for the direct connection ramp from southbound I-87 to westbound State Route 540, which contractors say will save money and time while minimizing traffic impacts during construction. They also say they optimized the design to reduce the expected earth movement by 1.3 million cubic meters.

This is the third segment of the Complete 540 project that Flatiron is working on. As the lead partner in another joint venture with Branch Civil, the Broomfield, Colo.-based contractor is also working on two of the Phase 1 sections expected to be completed in the fall.

Jim Schneiderman, senior vice president of Flatiron’s Mid-Atlantic division, said in a statement that the project “will pave the way for continued growth and greater opportunity in this fast-growing urban area by making everyday travel be safer and more efficient.”

Construction on the Phase 2 segment could also begin in the fall, with completion expected in 2028, according to Flatiron and NCDOT.

State officials awarded a $287 million contract for the other Phase 2 piece last fall to a Branch-ST Wooten joint venture.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCongress avoids shutdown and passes new limit
Next Article News and Opinions from New England
Machinery Asia
  • Website

Related Posts

Back problems? Construction workers shouldn’t have to wait for help

July 6, 2026

Turner lands $282 million arena modernization contract in South Carolina

July 6, 2026

Octave presents its AEC Connected Operations Strategy

July 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Back problems? Construction workers shouldn’t have to wait for help

Turner lands $282 million arena modernization contract in South Carolina

Octave presents its AEC Connected Operations Strategy

Zachry Construction Affiliate Lands $89 Million Texas Water Job

Popular Posts

Back problems? Construction workers shouldn’t have to wait for help

July 6, 2026

Turner lands $282 million arena modernization contract in South Carolina

July 6, 2026

Octave presents its AEC Connected Operations Strategy

July 6, 2026

Zachry Construction Affiliate Lands $89 Million Texas Water Job

July 6, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.