Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » March materials prices ‘surge’ amid conflict with Iran
Industry News

March materials prices ‘surge’ amid conflict with Iran

Machinery AsiaBy Machinery AsiaApril 15, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Building materials prices rose 2.2% in March, month over month, and 4.8% from March 2025, according to recent producer price index data released by the US Bureau of Labor Statistics.

The annual increase marks “the largest annual increase since January 2023,” Anirban Basu, chief economist at Associated Builders and Contractors, said in a statement.

While materials such as steel and steel products rose 1.6% and 2.1% respectively, crude oil prices have risen 20.2% since February.

“Prices of construction materials increased in March,” Basu said. “This monthly increase is due to rising oil prices, a direct result of the conflict in Iran, and it remains to be seen how this seismic geopolitical event will affect other input prices in the coming months.”

Despite rising prices, ABC’s construction backlog indicator rose to 8.6 months in March, up 0.5 months from February. Data centers continue to play a major role in construction growth: ABC’s survey shows that contractors working on data center projects report a 10.6-month backlog, while those without data center projects report an 8.3-month backlog.

By sector, infrastructure had the highest portfolio in March at 10.1 months, while heavy industry posted the lowest rate at 6.9 months. At regional level, the delay in the South was the highest, with 9.4 months.

“The portfolio has fully recovered from the four-year low in January and, at 8.6 months, is now back to levels not seen since last summer,” Basu said, adding that contactors appear “out of step” on higher input prices.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe Getty Center will close for a year for the first renovation in three decades
Next Article Nemetschek to buy HCSS for $2.4 million, expanding reach into software for heavy civil contractors
Machinery Asia
  • Website

Related Posts

GDC Greenlights $88M Trade Order Ahead of 2028 Hudson Tunnel Boring

July 15, 2026

Contractor wins $11.3 million judgment in Milwaukee wood tower lawsuit

July 15, 2026

Kennedy Center repairs were rushed, shoddy, whistleblowers allege

July 15, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

GDC Greenlights $88M Trade Order Ahead of 2028 Hudson Tunnel Boring

Contractor wins $11.3 million judgment in Milwaukee wood tower lawsuit

Kennedy Center repairs were rushed, shoddy, whistleblowers allege

Builders await implementation plans as the landmark housing bill becomes law

Popular Posts

GDC Greenlights $88M Trade Order Ahead of 2028 Hudson Tunnel Boring

July 15, 2026

Contractor wins $11.3 million judgment in Milwaukee wood tower lawsuit

July 15, 2026

Kennedy Center repairs were rushed, shoddy, whistleblowers allege

July 15, 2026

Builders await implementation plans as the landmark housing bill becomes law

July 14, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.