Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Portview to finish Buckingham’s job at Fulham Stadium
Industry News

Portview to finish Buckingham’s job at Fulham Stadium

Machinery AsiaBy Machinery AsiaSeptember 22, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Equipment specialist Portview has taken over work at Fulham Football Club’s Craven Cottage from collapsed contractor Buckingham Group.

Portview was already contracted to complete the interior fit-out of the new Riverside Stand once the base was completed by Buckingham Group. The job was left unfinished when Buckingham went into administration in September.

Portview chief operating officer Paul Lavery said: “Since the unfortunate demise of the Buckingham Group, we have picked up some of the outstanding elements of their work and continue to work closely with the club on this exciting project.”

Buckingham Group was appointed in 2019 as the main contractor for the £100 million project to demolish and rebuild the stand to increase its capacity.

The work was initially expected to last two years, but ran into problems related to the pandemic and difficult site conditions. Buckingham reported in 2021 that it expected to take a hit of £14.2m on the project as a result of the liquidation of a key subcontractor, Kaicer Building Envelope Solutions.

Fulham FC told fans in their latest update that they now expect the first part of the stand to open in 2024.

Some of Buckingham’s other stadium projects have also found replacement contractors. Mace took charge of work on Birmingham City FC’s Tilton and Kop stands, and Preston-based Rayner Rowen was appointed to complete Liverpool FC’s Anfield Road Stand.

Fulham FC have been contacted for comment.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFunds Advance Chicago Transit Authority $3.6 Million Red Line Extension
Next Article Part 1: Time, Money and Quality (choose three)
Machinery Asia
  • Website

Related Posts

The water, sewer contractor and a major homebuilder make the “Dirty Dozen” list.

April 24, 2026

Messer Construction begins construction on a $280 million university healthcare building

April 24, 2026

Colorado River States emergency water transfer as system nears hydroelectric ground

April 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The water, sewer contractor and a major homebuilder make the “Dirty Dozen” list.

Messer Construction begins construction on a $280 million university healthcare building

Colorado River States emergency water transfer as system nears hydroelectric ground

Punch List: Biden-era PLA mandate remains, prices rise, Skanska offers healthcare project

Popular Posts

The water, sewer contractor and a major homebuilder make the “Dirty Dozen” list.

April 24, 2026

Messer Construction begins construction on a $280 million university healthcare building

April 24, 2026

Colorado River States emergency water transfer as system nears hydroelectric ground

April 24, 2026

Punch List: Biden-era PLA mandate remains, prices rise, Skanska offers healthcare project

April 24, 2026
Heavy Machinery

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.