Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » The appeal of a 20-year-old pipeline
Industry News

The appeal of a 20-year-old pipeline

Machinery AsiaBy Machinery AsiaOctober 2, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

FNew customers can offer working pipelines that stretch decades ahead, but Sellafield has projects planned for up to a century for the safe storage of nuclear waste long after plant operations have ceased.

It needs talent across a range of construction disciplines, not all with nuclear experience, and recognizes it is in a highly competitive market, with other major infrastructure projects such as Hinkley Point and HS2.

Sellafield has £7bn of capital projects planned over the next 20 years, mainly on complex facilities to store and treat nuclear waste to replace those built decades ago.

Around £1.8 billion is spent annually with its supply chain on works of all types, 38% of which is directed at SMEs.

Sellafield has developed its Program and Project Partner (PPP) model as a 20-year vehicle for project delivery. PPP includes Sellafield, KBR (project services), Jacobs (design and engineering), Morgan Sindall Infrastructure (civil construction management) and Doosan Babcock (construction process management).

These partners have in turn brought in 10 long-term tier two partners: Balfour Beatty Kilpatrick, Sir Robert McAlpine, Altrad Babcock, Parker Technical Services, Seddon, Severfield, Hare, NG Bailey, with two more to be appointed this autumn.

Project manager Andy Sharples says: “We are competing for talent in the UK infrastructure, heavy
civil engineering and mechanical engineering, and we have a portfolio of infrastructure projects to deliver over the next 20 years.”

Despite being involved with Sellafield on and off for decades, Sharples says: “The scale and size of what we’re doing blew me away, even though I’d been told verbally what to visualize.”

Sharples stresses that the need to build a large number of storage buildings means that not all contractors require experience in the nuclear industry.

He says: “A lot of what we do is normal, heavy work, civil engineering, mechanical and electrical qualification and earthworks. So we have chosen four partners for the PPP, but we are not limited to them and we are in the process of letting a wider supply chain work as the amount of support we need exceeds our five organisations. “

For those interested in bidding for Sellafield work, the route goes through the designated partners, who “many suppliers are currently talking to, and what makes them different is the longevity of the period they are working on and across multiple projects across Sellafield. It used to be ‘do one project and move on to the next’, but this portfolio offers lasting work for the next 20 years.”

Sellafield’s operations focus on robotics and modern construction methods because the site is only 2.5 km.2 and has more than 1,000 buildings.

West Cumbria’s relatively remote location has meant that the pandemic-era shift from suppliers to remote working has endured, “much of our design work is done from a base in Warrington and those who don’t need being on site they work remotely. from other places in the region,” says Sharples.

For those who need to be there, West Cumbria’s location close to the Lake District means it is an attractive place to live for many who are looking for new challenges.

Those working on site can expect a strong emphasis on safety and being assessed for their suitability to work on a nuclear site, both from a capability and safety perspective, as Sellafield is a highly for sure.

For companies large or small that can deliver what Sellafield needs, the prospect of a 20-year portfolio of work will be attractive.

SPONSORED BY SELLAFIELD

  • For more information on collaboration with Construction newscontact maria.gonzales@emap.com

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article4 reasons to schedule your heavy haul ahead of time
Next Article Understanding customs territories | American Heavy Transport
Machinery Asia
  • Website

Related Posts

Back problems? Construction workers shouldn’t have to wait for help

July 6, 2026

Turner lands $282 million arena modernization contract in South Carolina

July 6, 2026

Octave presents its AEC Connected Operations Strategy

July 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Back problems? Construction workers shouldn’t have to wait for help

Turner lands $282 million arena modernization contract in South Carolina

Octave presents its AEC Connected Operations Strategy

Zachry Construction Affiliate Lands $89 Million Texas Water Job

Popular Posts

Back problems? Construction workers shouldn’t have to wait for help

July 6, 2026

Turner lands $282 million arena modernization contract in South Carolina

July 6, 2026

Octave presents its AEC Connected Operations Strategy

July 6, 2026

Zachry Construction Affiliate Lands $89 Million Texas Water Job

July 6, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.