Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » The government spent £1.25 billion on the canceled HS2 section
Industry News

The government spent £1.25 billion on the canceled HS2 section

Machinery AsiaBy Machinery AsiaOctober 10, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Department for Transport (DfT) has spent more than £1.25 billion on services related to the canceled second phase of HS2, according to recently analysed, bills.

The biggest beneficiary was Arup, which received £272.8m from March 2016 for ground reference, design services and environmental services.

Invoices paid by project contracting body HS2 Limited were analyzed by public sector consultancy Tussell. First Minister Rishi Sunak confirmed the high-speed line would not pass over Birmingham at the Conservative Party Conference last Wednesday (October 4).

Other contractors who received large sums for work on the scrapped railway project include Balfour Beatty (£192m), Bechtel (£78m) and Kier (£43m). A joint venture between Mace and Ward Williams received £243m. Aecom, which was the project’s ground research partner, received £95.1m.

The DfT also paid £1.2m to a joint venture between Balfour Beatty Civil Engineering and Carillion, which collapsed in January 2018. The money was paid in August 2018 for engineering services for Phase 2nd from Birmingham to Crewe, which stopped for two years. in March 2023 before being completely scrapped last week.

Around a sixth of the total (£219m) was spent on assets under construction in Phase 2a, Tussell found.

The last invoice was paid in May this year to Network Rail for design services and early contractor engagement works relating to the Crewe section.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleUrban quarries: cutting and cutting at Panorama St Paul’s
Next Article The main construction events of 2024 | Immersion in construction
Machinery Asia
  • Website

Related Posts

US Supreme Court sides with Trump to end protections for Haitians and Syrians

June 27, 2026

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

US Supreme Court sides with Trump to end protections for Haitians and Syrians

John Deere is betting that building connected roads is its next competitive advantage

Buildots launches Intelligence Lab, an AI-powered project data research center

$26.2M North Texas EOC Debuts as World Cup Command Center

Popular Posts

US Supreme Court sides with Trump to end protections for Haitians and Syrians

June 27, 2026

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026

$26.2M North Texas EOC Debuts as World Cup Command Center

June 26, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.