Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » PCL lands Saskatchewan hospital job for $667 million
Industry News

PCL lands Saskatchewan hospital job for $667 million

Machinery AsiaBy Machinery AsiaFebruary 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: New acute care tower of the Prince Albert Victoria Hospital
Value: C$898 million ($667 million)
Location: Prince Albert, Saskatchewan
Customer: Government of Saskatchewan

PCL based in Edmonton, Alberta won a $667 million design-build contract from the Saskatchewan government to create a new acute care tower at the Prince Albert Victoria Hospital, according to a Feb. 1 news release. The project includes a design and first works agreement that the government awarded to PCL in December 2022.

PCL will build a helipad on the tower’s roof, an expanded emergency department, larger operating rooms, pediatrics, maternity, a neonatal intensive care unit, new medical imaging and a First Nations and Métis cultural space, among other key services, according to the statement. . The new structure will increase the overall capacity of Victoria Hospital by 40%, from 173 to 242 beds.

“On behalf of PCL Construction and the extended design and construction team, we would like to express our pride and excitement in delivering the Victoria Hospital project for the Indigenous communities of Prince Albert, Northern Saskatchewan and the what this hospital serves,” said Mike. Staines, PCL district manager, in the statement.

Throughout the process, PCL will engage with local and indigenous vendors to provide services on the job, the company said. The first works include a new parking lot, which will be paved this spring, according to the release.

Construction on the new tower will begin in the spring of 2024, and officials anticipate completion in 2028.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleNY Construction Central | Engineering News-Register
Next Article George Hall selected as 2024 Colorado Legacy Award winner
Machinery Asia
  • Website

Related Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

Lessons from the debate over Maine’s data center moratorium on construction

Construction views to the east | Engineering News-Register

Popular Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026

Construction views to the east | Engineering News-Register

May 1, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.