Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Texas and southeast image: Module 6 of NASA’s Mobile Launcher 2 tower
Industry News

Texas and southeast image: Module 6 of NASA’s Mobile Launcher 2 tower

Machinery AsiaBy Machinery AsiaJune 1, 2026No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Jordan Vinson, a Bechtel communications supervisor covering the company’s work to deliver Tower Module 6 of NASA’s Mobile Launcher 2, says he had to wait a while to capture this image.

Calling it “one of my favorite photos,” he says his safety gear and fall prevention training allowed him to climb to the top of the 240-foot-tall tower and focus his shot on the irregularly shaped cavity at the base, called “the flame hole,” which he says is “built to withstand the violence of the commercial end of NASA’s Artemis rockets.”

Above the flame hole is an interior portion of the base and a section of the piping network of the base’s integrated mass ignition overpressure sound suppression system, which will force what Vinson describes as “a massive deluge of water into the base of the launcher during liftoff.”

Bechtel press secretary Ashley Accardo notes in the photo submission for ENR’s annual photo contest that the water deluge will reduce the noise load NASA’s Artemis rockets will exert on the launch pad, and that without this system, the launcher “would be destroyed by the rocket during liftoff.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePeople of Texas and the Southeast: June 2026
Next Article June 2026 Industry News: JE Dunn Crew Delivers Habitat for Humanity Home and Other News
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.